514 S. 7th Street
Corsicana, TX 75110 · Marshall's Tavern #4 LLC
Marshall's Tavern project adds parking and building improvements
A project at Marshall's Tavern Corsicana includes a new 9,150-square-foot parking lot, resealing and striping of the existing lot, a bathroom and office addition, and exterior renovation work. The project was registered with the Texas Department of Licensing and Regulation on November 18, 2024, under project number TABS2025005843. The applicant's estimated project cost is $325,000.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 18, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 18, 2024
- since Nov 18, 2024
- Largest scope
- 20,705 sf
- Estimated cost
- $325K
- state registration
Where this project stands
Finishing up · inspection nextMarshall's Tavern Corsicana
20,705 sq ft · $325K est.
- RegisteredNov 18, 2024
- Plan review
- ConstructionDec '24 – Apr '25
- Inspectednow
- Closed
Scheduled to finish Apr 1, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 project9,150 sq ft new parking lot; 9,125 sq ft original parking lot reseal and stripping; 450 sq ft bathroom and office addition; 1,480 sq ft exterior renovation with food trailer; new 500 gallon grease trap being installed. — marshall's tavern corsicana
TDLR project registrationAdditions to Existing BuildingReview Complete20,705 sq ft$325K est.- Project #
- TABS2025005843
- Tenant / owner
- Marshall's Tavern Corsicana
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 514 S. 7th Street
What is being built at 514 S. 7th Street in Corsicana?
The project includes a new parking lot, work on the existing lot, a 450-square-foot bathroom and office addition, and exterior renovation. The registration also lists a food trailer and a new 500-gallon grease trap.
When was the Marshall's Tavern Corsicana project registered?
The TDLR project registration was filed on November 18, 2024. Its project number is TABS2025005843.
Is Marshall's Tavern Corsicana getting a new parking lot?
Yes. The TDLR description lists a new 9,150-square-foot parking lot, plus resealing and striping for the 9,125-square-foot original lot.
How much is the Marshall's Tavern project expected to cost?
The applicant's estimated cost for the project is $325,000. This is an estimate, not a confirmed final cost.
What's being changed near One Stop Food Store on S. 7th Street?
About 289 meters from One Stop Food Store, the Marshall's Tavern Corsicana project includes parking work, a bathroom and office addition, and exterior renovation. It was registered with TDLR on November 18, 2024.
Is a new restaurant opening at 514 S. 7th Street?
The TDLR registration describes work at Marshall's Tavern Corsicana, including exterior renovation with a food trailer and installation of a grease trap. It does not state that a new restaurant is opening.
Also being built nearby
All of 75110- 801 S 7th St · One Stop Food StoreOct 11, 2024One stop corsicana — renovation/alteration — 3000 walking cooler doors and uplift the building and repair the side walk · 289 m away
- 105 W 7th Avenue · Pace AnnexMar 15, 2024Miracle-ear — renovation/alteration — interior only commercial tenant improvement remodeling for a new business tenant including new walls, doors, finishes, and limited hvac, plumbing, and electrical work · 455 m away
- 111 And 113 S. Beaton Street · Akhigbe Estate, LLCSep 17, 2025The akhigbe project — renovation/alteration — apartment units - second floor 4000 sq ft professional office space - first floor 3700 sq ft · 539 m away
- 111 E Collin StDec 3, 2025Napoli's italian restaurant and bar — renovation/alteration — interior remodel of an existing restaurant to repair and replace components damaged by recent fire · 542 m away
- 114 S. Beaton St · Cici Nails Spa LLCMar 20, 2025Cici nail salon — renovation/alteration — new walls, ceiling & flooring · 546 m away
- 901 East 13th Ave · Corsicana Housing AuthorityJun 2, 2025Corsicana housing authority, re-build eastside office — new construction — single story wood framed building with pre-engineered wood roof trusses and shingle roof. exterior walls brick veneer with 2x6 studs · 570 m away
- 814 S. Main St · Oil City Iron WorksJul 22, 2025Mold storage building — new construction — construct a 5,000 sq ft metal building for storage. the main frame columns will be anchored to new concrete footers. the floor of the building will be existing concrete paving · 598 m away
More offices in 75110, parking structures in 75110, restaurants in 75110.