1722 Routh St. Suites 970 & 980
Dallas, TX 75201 · One Arts Plaza
9th-floor spec suites and corridor planned at 1722 Routh St.
A 5,545-square-foot interior finish-out for 9th-floor spec suites and a corridor is registered for 1722 Routh St. The TDLR filing was submitted July 21, 2026, and describes HVAC, electrical and plumbing work in an existing suite.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 21, 2026
- since Jul 21, 2026
- Largest scope
- 5,545 sf
- Estimated cost
- $300K
- state registration
Where this project stands
Finishing up · inspection next9TH FLOOR SPEC SUITES + CORRIDOR
5,545 sq ft · $300K est.
- RegisteredJul 21, 2026
- Plan review
- ConstructionJul '26 – Oct '26
- Inspectednow
- Closed
Scheduled to finish Oct 31, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectNon-structral interior finish out in an existing single floor suite. includes hvac, electrical, plumbing. — one arts plaza
TDLR project registrationRenovation/AlterationReview Complete5,545 sq ft$300K est.- Project #
- TABS2026025815
- Tenant / owner
- 9th Floor Spec Suites + Corridor
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1722 Routh St. Suites 970 & 980
What is being built at 1722 Routh St. in Dallas?
A TDLR registration describes a 5,545-square-foot interior finish-out for 9th-floor spec suites and a corridor in an existing suite. The listed work includes HVAC, electrical and plumbing.
When was the 1722 Routh St. project filed?
The TDLR project registration was filed July 21, 2026. Its project number is TABS2026025815.
How much will the 9th-floor project at 1722 Routh St. cost?
The applicant's TDLR estimate is $300,000. This is an estimate for the project, not a confirmed final cost.
How large are the new spec suites at 1722 Routh St.?
The registration lists 5,545 square feet for the interior finish-out, including the spec suites and corridor.
What work is planned near the 9th Floor Restrooms at 1722 Routh St.?
The TDLR registration describes an interior finish-out for 9th-floor spec suites and a corridor, with HVAC, electrical and plumbing work. The 9th Floor Restrooms are listed at the same address.
Is the work at 1722 Routh St. a new building?
No new building is described in the TDLR filing. It identifies a non-structural interior finish-out in an existing suite.
Also being built nearby
All of 75201- 1722 Routh Street · Billingsley Arts Partners, Ltd.Mar 10, 2026Holland & knight dallas 15th floor renovation — renovation/alteration — complete renovation of second generation 37,096 sq ft tenant interior office suite
- 1722 Routh St · Billingsley Arts Partners LtdOct 13, 2026Electrical installation and light installation
- 2644 Ross AveAug 22, 2025Remove and replace sidewalk · 59 m away
- 1717 Arts PlzAug 25, 20261. remove existing master bathroom toilet and reinstall after completion of new tile work, including temporary storage, new wax ring, resetting, sealing, reconnection of water supply, and final operational check.2. remove toilet for second bathroom and install back when ready.3. connect new 2" drain line from existing 2” drain line to serve new freestanding tub location, including all necessary fittings, connections, and testing for proper drainage and code compliance upon completion.4. provide and install thermostatic mixing valve for tub filler, including all necessary fittings and connections, and provide access panel for future service and maintenance of valve and plumbing components.5. clean and service existing outdoor equipment as required to restore full functionality, including removal of debris, inspection of accessible components, and minor adjustments necessary for proper operation · 129 m away
- 1717 Leonard StJul 29, 2026Replace 2" rpz with a 1" rpz backflow on the roof serving the pool. replaced with a 1" as a 2" rpz was not necessary · 204 m away
- 2400 Flora StSep 22, 2026Replacing 1/2" backflow device on 2nd floor breakroom for coffee maker · 209 m away
- 2783 San Jacinto StJul 24, 2025Provide electrical service for job trailer in staging area for escalator project at city place dart rail. no construction to be done in staging site · 221 m away
- 1747 Leonard StMay 14, 2026Interior remodel of 28th floor penthouse - seperating floor into two suites · 223 m away
- 2403 Flora St · Dallas Center For The Performing Arts Foundation, Inc.Jun 12, 2026An existing 40 gallon electric water heater is leaking. we will purchase and install a new tank type electric water heater · 273 m away
- 2323 Ross AveNov 19, 2026Artwork on roof to be removed by others.remove turf from surface of existing roof. existing roof to remain in place.perform thermal scan of existing roof to determine areas of potential wet insulation.provide and install carlisle 135 mil fleeceback tpo membrane adhered in low rise foam adhesive directly to existing roof membrane · 287 m away
- 2323 Ross Avenue · Masaveu Ross Avenue LLCApr 29, 2025Bell nunnally - level 18 expansion — renovation/alteration — interior finish out of offices and support spaces · 287 m away
- 2330 Flora StMar 4, 2026Replace rpz in the kitchen entrance area and is the top right unit feeding large ice machine · 290 m away