2110 Live Oak St
Dallas, TX 75201
Driveway approach expansion planned at 2110 Live Oak St
A commercial driveway approach at 2110 Live Oak St is set to expand by about 125 square feet of concrete and pavers, with the ADA ramp moved back to improve clearance for buses. The City of Dallas permit was filed May 21, 2025, under permit COM-DSW-25-000003.
Summarized from City of Dallas records · updated May 21, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 21, 2025
- since May 21, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectWe’re expanding the driveway approach by approximately 125 square feet of concrete and pavers to improve bus exit flow. as part of this work, the ada ramp will be moved back to allow better clearance for buses while maintaining full accessibility
We’re expanding the driveway approach by approximately 125 square feet of concrete and pavers to improve bus exit flow. as part of this work, the ada ramp will be moved back to allow better clearance for buses while maintaining full accessibility
City of Dallas permitCommercial Drive Approach and Sidewalk Permit
Sources: City of Dallas
Questions about 2110 Live Oak St
What work is planned at 2110 Live Oak St?
A City of Dallas permit describes an expansion of the driveway approach by approximately 125 square feet of concrete and pavers, along with moving the ADA ramp back.
Why is the driveway approach being expanded?
The permit says the work is intended to improve bus exit flow and provide better clearance while maintaining accessibility.
When was the work at 2110 Live Oak St permitted?
The City of Dallas permit was filed May 21, 2025. The permit number is COM-DSW-25-000003.
Is a new building being planned at 2110 Live Oak St?
The available permit describes driveway approach and sidewalk work, not construction of a new building.
What's planned near Digital Realty Trust Break Room Updates 17 & 18?
At 2110 Live Oak St, about 291 meters from that address, a permit describes expanding a driveway approach and moving an ADA ramp to improve bus clearance.
Also being built nearby
All of 75201- 400 Olive StAug 28, 2026Backflow device replacement in the center tower on the 42nd floor · 14 m away
- 2104 Pacific AveOct 14, 2026Replace damaged parking lot lighting panel. esid10443720002850491 · 135 m away
- 2108 Pacific AveOct 8, 2026Replace damaged electrical panel · 136 m away
- 2138 Pacific AveOct 1, 2020Permanent electrical service · 151 m away
- 1910 Pacific AveNov 3, 2026Combining suite 1200 with 1400 to create a speakeasy room · 172 m away
- 2001 Bryan StJul 29, 2026Disconnect reconnect · 213 m away
- 2000 Elm StNov 16, 2020Supergraphics change copy · 212 m away
- 1999 Bryan StMay 27, 2026Replace backflow device on 31st floor · 220 m away
- 1999 Bryan Street 8th · Comm 2014-Ubs5 Harwood Center LLCMar 19, 20258th floor spec suites — renovation/alteration — interior remodel · 220 m away
- 300 N St Paul StMay 29, 2025Relocate meter from basement parking garage to new location at sidewalk · 229 m away
- 1933 Elm StApr 30, 2026Relocate gas meter from basement to new meter location · 242 m away
- 325 N St Paul StSep 30, 2026Replace 6-gallon water heater in sute 4100 kitchen · 248 m away