Office fit-outs permitted at 2323 Cedar Springs Rd
Office interior work is planned in multiple suites at 2323 Cedar Springs Rd, a multi-tenant building. A City of Dallas permit and TDLR registration filed November 6, 2026, describe a 5,650-square-foot tenant improvement in suite 950, including partitions, ceilings, finishes and mechanical, electrical and plumbing work.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Nov 6, 2026
- Projects
- 121
- 121 filings
- Latest filing
- Nov 6, 2026
- since Feb 1, 2024
- Largest scope
- 108,000 sf
- Estimated cost
- $20M
- state registration
Where this project stands
In state plan reviewEvercore Tenant Improvement Suite 950
5,650 sq ft · $350K est.
- RegisteredNov 6, 2026
- Plan reviewnow
- ConstructionJan '27 – Jun '27
- Inspected
- Closed
Construction is scheduled to start Jan 15, 2027. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 4 phone numbers
Permit & project history
121 projectsFirst commercial suite tenant improvement, 5,650 sq ft, suite 950. minor demolition, and construction of non-structural partitions, ceilings, finishes, furniture and mep. — 23 springs building
TDLR project registrationRenovation/AlterationProject Registered5,650 sq ft$350K est.- Project #
- TABS2027005362
- Tenant / owner
- Evercore Tenant Improvement Suite 950
- Design firm
- Pro
- Contact
- Pro
Interior expansion build out. all building core elements are to remain. enclosed offices, meeting rooms, and open office space workstations
Interior expansion build out. all building core elements are to remain. enclosed offices, meeting rooms, and open office space workstations
City of Dallas permitCommercial Electrical PermitQteam inhouse scope of work: first-generation full tenant fit-out of existing core and shell space for law firm. 12th floor - 2647313th floor - 26384 total square footage 52857
Qteam inhouse scope of work: first-generation full tenant fit-out of existing core and shell space for law firm. 12th floor - 2647313th floor - 26384 total square footage 52857
City of Dallas permitCommercial New Construction PermitInterior expansion build out. all building core elements are to remain. enclosed offices, meeting rooms, and open office space workstations
Interior expansion build out. all building core elements are to remain. enclosed offices, meeting rooms, and open office space workstations
City of Dallas permitCommercial New Construction PermitInterior office finish-out on the 21st and 22nd floor in an existing 26 story spec office building
Interior office finish-out on the 21st and 22nd floor in an existing 26 story spec office building
City of Dallas permitCommercial Alteration Addition PermitInterior expansion/finish out for 2,874 sq ft of existing office space. — 23 springs
TDLR project registrationRenovation/AlterationProject Registered2,874 sq ft$313K est.- Project #
- TABS2027000364
- Tenant / owner
- Savills Expansion
- Design firm
- Pro
- Contact
- Pro
1,955 — 23 springs
TDLR project registrationRenovation/AlterationReview Complete1,955 sq ft$165K est.- Project #
- TABS2026026630
- Tenant / owner
- 11th Floor Corridor
- Design firm
- Pro
- Contact
- Pro
Mcr address: 2323 cedar springs 12900 sq ft interior finish out of a first generation office space
Mcr address: 2323 cedar springs 12900 sq ft interior finish out of a first generation office space
City of Dallas permitCommercial Alteration Addition PermitQteam inhouse- interior tenant improvement to new non-structural partitions, finishes, lighting, plumbing and mechanical work
Qteam inhouse- interior tenant improvement to new non-structural partitions, finishes, lighting, plumbing and mechanical work
City of Dallas permitCommercial New Construction PermitInstall four sinks and insta-hots at new break and wellness rooms. install two lavatories, two water closets and two floor drains at new restrooms
Install four sinks and insta-hots at new break and wellness rooms. install two lavatories, two water closets and two floor drains at new restrooms
City of Dallas permitCommercial Plumbing PermitInterior tenant improvement including but not limited to non-structural partitions, finishes, lighting, plumbing, and mechanical work
Interior tenant improvement including but not limited to non-structural partitions, finishes, lighting, plumbing, and mechanical work
City of Dallas permitCommercial Alteration Addition PermitInstall 420ft of copper for domestic water throughout 20th floor with insulation and connect 400ft of sanitary sewer venting to the 19th floor.install fixtures2 glass risner2 glass filters3 water filters4 insta hots3 pantry sinks1 hand sink8 double check valves
Install 420ft of copper for domestic water throughout 20th floor with insulation and connect 400ft of sanitary sewer venting to the 19th floor.install fixtures2 glass risner2 glass filters3 water filters4 insta hots3 pantry sinks1 hand sink8 double check valves
City of Dallas permitCommercial Plumbing PermitInterior tenant improvement including but not limited to new non-structural partitions, finishes, lighting, plumbing, and mechanical work
Interior tenant improvement including but not limited to new non-structural partitions, finishes, lighting, plumbing, and mechanical work
City of Dallas permitCommercial Alteration Addition PermitInstall 420 ft of copper for domestic water throughout 20th floor with insulation and connect 400 ft of sanitary sewer venting to the 19th floor.install fixtures2 glass risner2 glass filters3 water filters4 insta hots3 pantry sinks1 hand sink8 double check valves
Install 420 ft of copper for domestic water throughout 20th floor with insulation and connect 400 ft of sanitary sewer venting to the 19th floor.install fixtures2 glass risner2 glass filters3 water filters4 insta hots3 pantry sinks1 hand sink8 double check valves
City of Dallas permitCommercial Plumbing Permit• provision & installation of the following:o (22) fpb’so (18) vav’so (2) wshp’so (2) inline exhaust fanso (2) motorized damperso (2) fire/smoke dampers, where shown on planso hangers and supports as specifiedo ductwork with insulationo grilles, registers, and diffusers with flex ducto condenser water piping
• provision & installation of the following:o (22) fpb’so (18) vav’so (2) wshp’so (2) inline exhaust fanso (2) motorized damperso (2) fire/smoke dampers, where shown on planso hangers and supports as specifiedo ductwork with insulationo grilles, registers, and diffusers with flex ducto condenser water piping
City of Dallas permitCommercial Mechanical PermitManufacture (eaton) is to repair internal control wiring within main switchboard ms1. also need to add gfi protection to ms2 switchgear. both switchgears will require utility shutdown and meter release from city
Manufacture (eaton) is to repair internal control wiring within main switchboard ms1. also need to add gfi protection to ms2 switchgear. both switchgears will require utility shutdown and meter release from city
City of Dallas permitCommercial Electrical PermitQteam qr ubs is relocating their wac office to the new 23springs tower in uptown dallas, tx. this is a 25,000 sq ft tenant build-out on the 20th floor of the tower
Qteam qr ubs is relocating their wac office to the new 23springs tower in uptown dallas, tx. this is a 25,000 sq ft tenant build-out on the 20th floor of the tower
City of Dallas permitCommercial Alteration Addition Permit
+ 81 older projects. See the full history with a free trial.
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 2323 Cedar Springs Rd
What is being built at 2323 Cedar Springs Rd?
Recent filings describe office tenant improvements and interior fit-outs in multiple parts of the building, rather than a single tenant occupying the address. The November 6, 2026, suite 950 project covers 5,650 square feet.
What is going into suite 950 at 2323 Cedar Springs?
A TDLR registration names the project Evercore Tenant Improvement Suite 950 and describes non-structural partitions, ceilings, finishes, furniture and mechanical, electrical and plumbing work. The registration and City of Dallas permit were filed November 6, 2026.
What is the permit number for the suite 950 work?
The City of Dallas permit is COM-ALT-ADD-26-002719, filed November 6, 2026, for an interior finish-out of suite 950. The related TDLR registration is TABS2027005362.
Is office space being renovated at 2323 Cedar Springs?
Yes. Records include a Savills expansion and finish-out registration dated September 4, 2026, for 2,874 square feet of existing office space, as well as other office interior permits.
Is a law firm fit-out planned at 2323 Cedar Springs Rd?
A City of Dallas permit filed October 30, 2026, describes a first-generation tenant fit-out for a law firm on the 12th and 13th floors, totaling 52,857 square feet.
What office work is happening near Torchy's Tacos on Cedar Springs?
At 2323 Cedar Springs Rd, about 20 meters from Torchy's Tacos at 2305 Cedar Springs Road, records describe office tenant improvements, including work in suite 950 and on the 12th and 13th floors.
Also being built nearby
All of 75201- 2323 Cedar Spring Road · 23 Springs LPJun 1, 2026Prologis — renovation/alteration — interior tenant improvement including but not limited to new non-structural partitions, finishes, lighting, plumbing, & mechanical work. square footage 15,388
- 2323 Cedar Springs 22nd · 23 Springs, LPJul 2, 202522nd floor corridor — renovation/alteration — capital improvement
- 2323 Cedar Springs 14th · 23 Springs, LPJul 2, 20254th floor corridor — renovation/alteration — capital improvement
- 2323 Cedar Springs Road · 23 Springs LPOct 7, 2026Evercore tenant improvement suite 950 — renovation/alteration — first commercial suite tenant improvement, 5,650 sq ft, suite 950. minor demolition, and construction of non-structural partitions, ceilings, finishes, furniture and mep
- 2323 Cedar Springs Rd 21st & 22nd · 23 Springs LPSep 10, 2026Crusoe dallas — renovation/alteration — interior office finish-out on the 21st and 22nd floor in an existing 26 story spec office building, totaling 33,276 sq ft
- 2323 Cedar Springs · 23 Springs LPMay 7, 2026The prudential insurance company of america — new construction — 12900 sq ft interior finish out of a first generation office space
- 2305 Cedar Springs Road · 23 Springs LPNov 13, 2025Torchy's tacos — renovation/alteration — tenant interior finish-out for a restaurant (2,533 square feet) · 20 m away
- 2305 Cedar Springs RdMar 10, 2026Install refrigeration for walk-in cooler · 20 m away
- 2364 Cedar Springs RdOct 1, 2020Service release no work · 48 m away
- 2620 Maple AveOct 14, 2020Tc-2020-16433 09/14/2020 to 1/26/2022 lane closure hours 9am to 330 pm daily per plan 24/7 for concr · 84 m away
- 2701 Maple AveJul 13, 2026Plumbing to first floor · 91 m away
- 2264 Cedar Springs Rd · City Of DallasJun 23, 2025Cedar springs road pedestrian hybrid beacon — renovation/alteration — enhancing the existing crosswalk crossing, sidewalk, pedestrian hybrid beacon, and pavement markings/signage · 92 m away