3333 Harry Hines Blvd
Dallas, TX 75201
Permits describe replacing a dog park with wood decking
City of Dallas permits filed Jan. 15 and Mar. 3, 2026, describe removing an existing dog park and adding wood decking at 3333 Harry Hines Blvd. One permit specifies a 22-by-24-foot deck; another describes an 800-square-foot deck. Other permits cover two new sinks in the pool area and a gas meter repair.
Summarized from City of Dallas records · updated Mar 3, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Mar 3, 2026
- since Jul 31, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsMcr remove dog park on east elevation and constructing an 800 square foot single level wood composite deck
Mcr remove dog park on east elevation and constructing an 800 square foot single level wood composite deck
City of Dallas permitCommercial Alteration Addition PermitRemoval of an existing dog park and addition of a 22' x 24' wood deck founded on concrete piers
Removal of an existing dog park and addition of a 22' x 24' wood deck founded on concrete piers
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 3333 Harry Hines Blvd
What is being built at 3333 Harry Hines Blvd?
Dallas permits describe removing an existing dog park and building a wood deck. One permit specifies a 22-by-24-foot deck, and another describes an 800-square-foot deck.
When were the deck permits filed at 3333 Harry Hines Blvd?
The City of Dallas filed permits for the deck work on Jan. 15 and Mar. 3, 2026. The permit numbers are COM-ALT-ADD-25-001732 and COM-ALT-ADD-25-001106.
Is a new dog park being built at 3333 Harry Hines Blvd?
The permits describe removing an existing dog park, not building a new one. They also describe adding wood decking.
What other work is permitted at 3333 Harry Hines Blvd?
A permit filed Oct. 20, 2025, describes installing two sinks in the pool area. A July 31, 2025, permit covers a gas meter repair.
What construction is happening near Spec Suite 1650 at 2950 N. Harwood Street?
At 3333 Harry Hines Blvd, about 471 meters away, Dallas permits describe removing an existing dog park and adding wood decking. The deck permits were filed in January and March 2026.
What work is permitted near Producers Midstream at 3500 Maple Ave?
At 3333 Harry Hines Blvd, about 518 meters away, permits describe wood deck construction, two new sinks in the pool area, and a gas meter repair.
Also being built nearby
All of 75201- 3131 N. Harwood St · Kdp Ch Investors, Lp.Jul 2, 2025Chalk hill office building — new construction — 17 level office building, core & shell (level 1 lobby, 16 levels office) · 241 m away
- 3130 N Harwood StSep 28, 2026Gas line and exhaust installation for fireplace · 246 m away
- 1605 N Stemmons Freeway · Ddd Stemmons Holdings LLCJul 11, 2024Edison parking lot — new construction — demolition of existing building and construction of a 1.54 acre commercial parking lot using decomposed granite to be used as a valet lot · 273 m away
- 3521 Harry Hines BlvdSep 2, 2025Replace service mast, 150 a meter socket, and load center for billboard sign · 326 m away
- 3100 Mckinnon StreetMay 30, 2024Targa stair infill — renovation/alteration — revert back an interior space to its original state by removing an internal staircase and infill the floor opening · 332 m away
- 3031 N Harwood St · Kdp Ch Investors, Lp.Jul 21, 2025Qteam meeting 9.4.2025 3131 n harwood for office and 3031 n harwood for hotel 29 story hotel/condo tower, core/shell & interiors (1 lobby level/amenity level/8 levels hotel/13 levels condo)17 level office building, core & shell (level 1 lobby, 16 levels office)4 above grade parking 3 stories of basement level · 335 m away
- 1645 Stemmons Fwy · Dunhill Partners INCFeb 22, 20241645 stemmons fwy suite a — renovation/alteration — interior rennovation of existing showroom space · 373 m away
- 3000 Harry Hines BlvdSep 11, 2025Install power to temp location · 383 m away
- 1330 Hi Line Dr · Studio 1330 LtdOct 18, 2024Reece bath & kitchen showroom hi line — renovation/alteration — commercial remodel of an existing 6464 square foot space for a retail bath and kitchen show room. interior remodel of existing location to include two new restrooms, interior finishes, walls, and alterations to existing mechanical systems · 383 m away
- 1400 Hi Line DrJul 1, 2026Bu zo manufacture and install illuminated reader board faced canopy · 389 m away
- 3111 N Houston StNov 12, 2026Mcr overflow storage for bike mart finish out (suite 100). add sheetrock to existing metal framed walls · 397 m away
- 3008 N. Harwood Street · One Harwood Boulevard, Ltd.Nov 12, 2024Harwood 15 — new construction — the project consists of a new twenty-three (23) story office tower with approximately 681,455 gsf. the project will consist of an office building, a parking garage, retail space, and site improvements · 399 m away
More pools in 75201.