609 N Harwood St
Dallas, TX 75201
Plumbing permits record backflow work at 609 N Harwood
City of Dallas permits record plumbing work at 609 N Harwood St, including a backflow replacement filed August 11, 2026. Earlier filings in 2026 describe a gas leak at a stove supply manifold and a required gas-line pressure test; the records do not describe a new building project.
Summarized from City of Dallas records · updated Aug 11, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Aug 11, 2026
- since Jan 29, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 609 N Harwood St
What is being built at 609 N Harwood St in Dallas?
The available Dallas permits describe plumbing work, not a new building. The latest filing, permit COM-PLM-26-002714, is for a backflow replacement and is dated August 11, 2026.
What plumbing work was permitted at 609 N Harwood St?
The 2026 records include a backflow replacement, a gas leak repair at a manifold feeding a stove, and a required gas-line pressure test. The filings are dated August 11, April 16, and January 29, respectively.
Is a new building planned at 609 N Harwood St, Dallas, TX 75201?
The records provided do not show a new building project. They list three commercial plumbing permits filed in 2026.
What work is recorded near 22nd Floor Spec Suites?
At 609 N Harwood St, about 237 meters from 22nd Floor Spec Suites, Dallas permit records describe plumbing work, including a backflow replacement filed August 11, 2026.
What work is happening near Citi - Trammel Crow on Ross Avenue?
A separate address, 609 N Harwood St, is about 280 meters from Citi - Trammel Crow. Its 2026 permit filings cover plumbing work, including a backflow replacement and gas-line work.
Also being built nearby
All of 75201- 717 Harwood · Skw-B Harwood Owner, LLCJun 4, 2025Gs dallas temp space - harwood hilltop securities lvls 25-26 — renovation/alteration — renovation to existing suite for sublease · 71 m away
- 717 N Harwood StMay 8, 2026Rpz replacement at ice machine · 71 m away
- 717 Harwood Street, 27th · Skw-B Harwood Owner, LLCSep 13, 2024Reelfx downsize and public areas, speculative suites — renovation/alteration — interior finish-out of existing office space · 71 m away
- 717 North Harwood Street · Skw-B Harwood Owner, LLCSep 13, 2024Asurity mortgage group, llc downsize — renovation/alteration — interior finish-out of existing office space · 71 m away
- 1999 Bryan StMay 27, 2026Replace backflow device on 31st floor · 74 m away
- 1999 Bryan Street 8th · Comm 2014-Ubs5 Harwood Center LLCMar 19, 20258th floor spec suites — renovation/alteration — interior remodel · 74 m away
- 2001 Bryan StJul 29, 2026Disconnect reconnect · 74 m away
- 1919 Federal StSep 9, 2025Update electrical for a dumspter room, new lighting, outlets, and power for a garage door opener · 94 m away
- 1919 Bryan StSep 10, 2026Like for like replacement of two split hvac systems. no alterations or changes required · 119 m away
- 1909 Bryan StOct 27, 2025Repair of electrical in a dumpster room · 129 m away
- 400 N St Paul StNov 6, 2025Gas leak atmos locked the meter out we have made the repairs on the gas line and there is no more leaks · 136 m away
- 400 N. Saint Paul Street · Hartford Living, LLCJun 9, 2025The hartford — renovation/alteration — historic renovation of a 15 story masonry office building into a multi-family development with 217 residential apartments on floors 2-13. the 14th floor will be transformed into the residential amenity space · 136 m away