310 S Houston St
Dallas, TX 75202
310 S Houston St: 1 project on record
City of Dallas lists 1 filing across 1 project at 310 S Houston St, Dallas, TX 75202. The most recent, filed December 9, 2020, covers: “Erect attached sign”.
Compiled from City of Dallas records · updated Dec 9, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Dec 9, 2020
- since Dec 9, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 310 S Houston St
What is being built at 310 S Houston St?
The latest filing (City of Dallas permit 2012041088, December 9, 2020) covers erect attached sign.
How many permits and filings does 310 S Houston St have?
1 filing across 1 project, from December 9, 2020 to December 9, 2020.
What is being built near Dallas County in Dallas?
310 S Houston St is about 197 m from Dallas County (100 South Houston Street). Its latest filing is for erect attached sign.
Is there other construction near 310 S Houston St?
Yes. Nearby filings include 302 S Houston St (erect attached sign, Jan 18, 2021); 400 S Record St (26.0111 1st floor lobby rrsreworking existing hvac system, May 19, 2026); 606 Young St (install fence, Jan 25, 2021).
How do I get alerts for new permits at 310 S Houston St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75202- 302 S Houston StJan 18, 2021Erect attached sign · 4 m away
- 400 S Record StMay 19, 202626.0111 1st floor lobby rrsreworking existing hvac system · 106 m away
- 606 Young StJan 25, 2021Install fence · 169 m away
- 700 Jackson StDec 6, 2025The proposed project will have a 252.30 kwp/180 kw carport solar pv system, which will be installed on the 12th floor of the parking garage · 171 m away
- 703 Wood StDec 16, 2020Permanent electrical service · 177 m away
- 354 Hyatt Regency Hotel DrJul 24, 2026New 100a, 120/240v single phase, underground service for union pacific railroad · 192 m away
- 100 South Houston Street · Dallas CountySep 10, 2026Old red courthouse - court of appeals relocation — renovation/alteration — renovation of historic courthouse for court of appeals (60,000 sq ft) and new tunnel under commerce street connecting to existing courthouse · 197 m away
- 701 Commerce StJan 11, 2021Interior remodel only · 208 m away
- 501 Main StJan 12, 2021Excavations four to twelve feet in depth · 209 m away
- 158 N Houston StOct 8, 2020Tc-2020-20063 10/14/2020 7am to 7pm · 251 m away
- 800 Jackson Street · Metro Dallas Downtown Investments I, LLCSep 15, 2025Home2 suites dallas downtown — renovation/alteration — adaptive reuse 50k sq ft with 50k additio · 261 m away
- 800 Jackson StMay 22, 2025Qteam we are transforming a 5-story office building that was built in 1913 into a 7-story hotel—a full-scale commercial renovation and vertical expansion project. this includes repurposing the existing structure for hospitality use, adding two new floors, and redesigning the interior and exterior to meet modern hotel standards. at the same time, we are creating a beautiful, welcoming space for members of the community to enjoy—whether they're visiting guests, attending events, or simply looking for a vibrant place to connect, relax, and feel at home · 261 m away