411 N Akard St
Dallas, TX 75202
411 N Akard St: 5 projects on record
City of Dallas lists 5 filings across 5 projects at 411 N Akard St, Dallas, TX 75202 since October 2, 2020. The most recent, filed November 24, 2020, covers: “Supergraphics change copy”.
Compiled from City of Dallas records · updated Nov 24, 2020
- Projects
- 5
- 5 filings
- Latest filing
- Nov 24, 2020
- since Oct 2, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsSources: City of Dallas
Questions about 411 N Akard St
What is being built at 411 N Akard St?
The latest filing (City of Dallas permit 2011244004, November 24, 2020) covers supergraphics change copy.
How many permits and filings does 411 N Akard St have?
5 filings across 5 projects, from October 2, 2020 to November 24, 2020.
What is being built near Remi Downtown Holding Company, in Dallas?
411 N Akard St is about 0 m from Remi Downtown Holding Company, (411 N Akard Street). Its latest filing is for supergraphics change copy.
Is there other construction near 411 N Akard St?
Yes. Nearby filings include 411 N Akard Street (remi downtown — renovation/alteration — exterior facade alterations and interior renovations to be located on level 1. interior reno to incllude leasing and amenity spaces, Dec 17, 2024); 1505 Federal St (qteam meeting 10.9.2025 this is a mixed use project of type iib construction. there will be a renovation of existing 3.5 story building and basement. demolition penthouse (roof) to add a 4th, 5th, and 6th level additions. renovation and addition will be apartments. basement will include a public rentable storage facility, fitness center (tenants only) and boh spaces. level 01 retail tenants to remain, Sep 16, 2025); 500 N. Akard Street (pine st and elsie faye heggins st pedestrian improvements — renovation/alteration — reconstruct and widen sidewalks, install pedestrian lighting, and reconstruct/upgrade crosswalks and associated traffic signal infrastructure, Aug 6, 2026).
How do I get alerts for new permits at 411 N Akard St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75202- 411 N Akard Street · Remi Downtown Holding Company, LLCDec 17, 2024Remi downtown — renovation/alteration — exterior facade alterations and interior renovations to be located on level 1. interior reno to incllude leasing and amenity spaces
- 411 N Akard StMay 28, 2025Furnishing of labor, materials, equipment and services in connection with the construction of the hvac project
- 1505 Federal StSep 16, 2025Qteam meeting 10.9.2025 this is a mixed use project of type iib construction. there will be a renovation of existing 3.5 story building and basement. demolition penthouse (roof) to add a 4th, 5th, and 6th level additions. renovation and addition will be apartments. basement will include a public rentable storage facility, fitness center (tenants only) and boh spaces. level 01 retail tenants to remain · 37 m away
- 500 N. Akard Street · City Of DallasAug 6, 2026Pine st and elsie faye heggins st pedestrian improvements — renovation/alteration — reconstruct and widen sidewalks, install pedestrian lighting, and reconstruct/upgrade crosswalks and associated traffic signal infrastructure · 65 m away
- 500 North Akard · Baylor UniversityJun 4, 2026Baylor nursing school — renovation/alteration — updating finishes, light construction, and cleaning to fit the needs of nursing school · 65 m away
- 500 N. Akard Street · Ross Tower Schpi LPMar 3, 2026Costar dallas — renovation/alteration — tenant fit out of 1 floor of office space within an existing 45-story office tower. all building core elements to remain. new work includes open office areas, enclosed meeting spaces, break room, furniture, finishes and av · 65 m away
- 500 N. Akard · Ross Tower Schpi LPMar 17, 2025Gresham smith expansion — renovation/alteration — 8,451 sq ft of tenant improvement with small expansion · 65 m away
- 500 North Akard Street · Ross Tower Schpi LPJul 31, 2025Steptoe & johnson - 35th floor expansion — renovation/alteration — interior renovation of existing office space · 65 m away
- 500 N. Akard, 38th · Ross Tower Schpi LPJul 10, 202538th floor demolition & restroooms — renovation/alteration — demolition of existing conditions in preparation for new full-floor tenant and renovation of multi-tenant restrooms · 65 m away
- 500 N. Akard Street · City Of DallasAug 6, 2026Camp wisdom rd pedestrian improvements — renovation/alteration — reconstruct and widen sidewalks, install pedestrian lighting, and reconstruct/upgrade crosswalks and associated traffic signal infrastructure · 65 m away
- 500 N Akard St · Ross Tower Schpi.lpApr 21, 2026Q-team interior renovation of an office space on the 14thfloor of an existing 45-story office tower. therenovation scope of work includes selective demolition,construction of interior non-structural partitions, andfinish updates · 65 m away
- 511 N Akard StSep 24, 2020Supergraphics change copy · 75 m away