200 E. Clarendon
Dallas, TX 75203 · Fjm I LLC
Los Mismos Bus Station garage planned at 200 E. Clarendon
A new 11,490-square-foot garage for Los Mismos Bus Station is planned at 200 E. Clarendon. The project was registered with the Texas Department of Licensing and Regulation on September 19, 2024, with an estimated project cost of $1.5 million. Its TDLR status is listed as Review Complete.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 19, 2024
- since Sep 19, 2024
- Largest scope
- 11,490 sf
- Estimated cost
- $1.5M
- state registration
Where this project stands
Finishing up · inspection nextLos Mismos Bus Station
11,490 sq ft · $1.5M est.
- RegisteredSep 19, 2024
- Plan review
- ConstructionJan '25 – Dec '25
- Inspectednow
- Closed
Scheduled to finish Dec 3, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectBus station garage — los mismos bus station garage
TDLR project registrationNew ConstructionReview Complete11,490 sq ft$1.5M est.- Project #
- TABS2025001438
- Tenant / owner
- Los Mismos Bus Station
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 200 E. Clarendon
What is being built at 200 E. Clarendon in Dallas?
A new garage for Los Mismos Bus Station is planned at the address. The TDLR registration describes it as new construction.
Is a bus station being built at 200 E. Clarendon?
The project is named Los Mismos Bus Station and is described as a bus station garage. The TDLR record does not specify other station facilities.
How big is the Los Mismos Bus Station garage?
The TDLR registration lists the garage at 11,490 square feet.
When was the project at 200 E. Clarendon filed?
The project was registered with TDLR on September 19, 2024. Its registration number is TABS2025001438.
How much will the garage at 200 E. Clarendon cost?
The TDLR record lists an estimated project cost of $1.5 million. This is the applicant's estimate, not a confirmed final cost.
What is the status of the Los Mismos Bus Station project?
The TDLR registration lists the project status as Review Complete.
Also being built nearby
All of 75203- 152 E Clarendon DrJun 22, 2026Construction of a hemphill, llc cellular communication tower site including a 80’ monopole within a 100’ x 24’ fenced lease area. the monopole will have at&t antennas at a 75’ centerline with space for 3 additional future carriers. associated ground equipment will be within the 100’ x 24’ fenced lease area · 64 m away
- 214 E Jerden LnJan 13, 2021Gas relay or repair with test · 111 m away
- 1123 S Beckley AveJun 9, 2025Qteam inhouse commercial addition detached · 148 m away
- 1125 S Beckley AveJul 1, 2025Coomercial addition · 148 m away
- 1041 S Beckley AveAug 11, 2026Bu zo addition and canopy work will be performed · 167 m away
- 1026 Rockwood StJul 24, 2026Gas repair/test · 184 m away
- 1003 Rockwood StJun 15, 2026Demolition · 195 m away
- 1019 Cumberland StFeb 5, 2026Gas test to re-store service to the house · 231 m away
- 226 South Shore DrMay 18, 2026Tree branch fell on service and no work performed other than the repairs to get service back up and running · 240 m away
- 123 North Shore DrJul 15, 2025Replace s50ft yard water service · 241 m away
- 218 South Shore DrDec 30, 2025Install 9 total pilings (7 exterior, 2 via crawlspace) · 245 m away
- 206 South Shore DrAug 4, 2026Remove all exisiting asphalt shingles. remove osb decking. remove entire drip edge surrounding roof. replace osb decking. install felt paper. install metal drip edge around perimeter of roof. install flashing around chimney. replace all asphalt shingles · 254 m away