205 E Davis St
Dallas, TX 75203
Boiler room gas pressure test permitted at 205 E Davis St
A commercial plumbing permit records a gas pressure test in the boiler room at 205 E Davis St. The City of Dallas permit was filed September 23, 2026; the record does not describe a new building or identify an occupant.
Summarized from City of Dallas records · updated Sep 23, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 23, 2026
- since Sep 23, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 205 E Davis St
What is being built at 205 E Davis St in Dallas?
The permit record describes a gas pressure test in the boiler room, not construction of a new building. It does not identify an occupant.
What work was permitted at 205 E Davis St?
A commercial plumbing permit records a gas pressure test in the boiler room. The permit number is COM-PLM-26-003785.
When was the 205 E Davis St permit filed?
The City of Dallas permit was filed on September 23, 2026.
Is a new building planned at 205 E Davis St?
The available permit describes a boiler room gas pressure test and does not indicate that a new building is planned.
What is happening near I-35 & 8th in Dallas?
At 205 E Davis St, 91 meters from the I-35 & 8th landmark, a September 23, 2026 permit records a gas pressure test in the boiler room.
Is the work at 205 E Davis St a plumbing project?
Yes. The City of Dallas record is a commercial plumbing permit for a boiler room gas pressure test.
Also being built nearby
All of 75203- 211 E Davis StSep 22, 2026Gas pressure test boiler room · 6 m away
- 292 E. 8th Ave · Noble Oak Cliff, LLCApr 7, 2026I-35 & 8th — renovation/alteration — tenant improvement of an existing shell building for starbucks coffee. work shall include interior partitions, interior finishes, equipment, lighting, hvac, plumbing and signage. signage permit under separate permit · 91 m away
- 312 N Patton AveNov 11, 2020Sewer relay · 113 m away
- 321 E 8th StOct 16, 2026Requesting an electrical service release for oncor meter installation at an existing residential property. no work · 120 m away
- 324 N Patton AveMay 15, 2025New building associate with permit #2407041011 · 139 m away
- 101 E Davis StSep 25, 2025New plumbing finish out grease waste sewer hot cold water system underground and top out and install fixtures · 148 m away
- 101 W Davis StSep 29, 2025Replace all new electrical · 161 m away
- 341 N Patton AveSep 28, 2020Demolition sfd · 174 m away
- 111 W Davis St · The Barvin GroupApr 30, 2026Plumbing works as plan. sink connection, gas line and 4 rpz · 177 m away
- 719 N Crawford StApr 20, 2026Gas test · 183 m away
- 129 Oscar DrJan 22, 2026Gas inspection for meter release · 186 m away
- 114 W Seventh St · Mobalu LLCApr 30, 2024Besos dallas — renovation/alteration — grage to be turned into a bar and grill · 187 m away