210 N Cliff St
Dallas, TX 75203
Roof replacement permitted at 210 N Cliff St
A residential roof replacement was permitted at 210 N Cliff St on June 25, 2026. The permit describes installation of 32 squares of three-tab weatherwood shingles; earlier City of Dallas permits from November 2019 record repairs following fire damage.
Summarized from City of Dallas records · updated Jun 25, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jun 25, 2026
- since Jun 25, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 210 N Cliff St
What is being built at 210 N Cliff St, Dallas?
The records do not show a new building project at this address. A City of Dallas permit dated June 25, 2026, covers a residential roof replacement using 32 squares of three-tab weatherwood shingles.
When was the roof replacement at 210 N Cliff St permitted?
It was permitted on June 25, 2026, under permit RES-ROOF-26-001071.
What kind of roof is being installed at 210 N Cliff St?
The permit describes 32 squares of three-tab weatherwood shingles.
Was there fire damage at 210 N Cliff St?
City of Dallas records show a building renovation permit on November 4, 2019, for fire-damage repairs with no structural changes, followed by an electrical permit on November 8, 2019, to repair the meter base.
What work is happening near Dallas Independent School District on E 8th Street?
At 210 N Cliff St, about 137 meters from the Dallas Independent School District address listed in the records, a residential roof replacement was permitted on June 25, 2026.
Also being built nearby
All of 75203- 207 N Cliff StSep 28, 2026New construction plumbing · 35 m away
- 1130 E 9th StNov 6, 2026Gas line repair · 91 m away
- 1124 E 9th StMay 15, 2026Nsfaa new construction of duplex · 96 m away
- 1113 E 9th StApr 15, 2026Replace 5 decking boardsremove current shinglesreplace with new roofing system · 100 m away
- 112 N Cliff StSep 22, 2026Nsfaa construct a new construction single family residence with a detached garage · 115 m away
- 1128 Church StMay 8, 2026Wire new house · 119 m away
- 1225 Noah StMay 9, 2025The proposed project involves the construction of a 12' x 32' dormer cabin to be used for storage purposes. the cabin will be a single-story structure with a gable roof featuring a 7:12 pitch. the cabin will be built using wood framing and 29 gauge metal roofing for durability and weather resistance.the foundation will consist of a post and beam system, with dimensions of 12' x 32'. the walls will be framed using 2x4 studs at 16" on center, and the floor will be supported by 4x6 beams and 2x6 treated floor joists spaced 16" apart. the roof will be constructed with 2x6 rafters, and lp smartside siding will be used for the exterior finish.the cabin will be self-contained, with no plumbing, electrical, or hvac systems. there will be no exterior porches or stairs, and the building will be 11'9" tall at its highest point.the structure will be built according to local building codes, and all work will comply with applicable zoning regulations, including required setback distances from property lines. the project will not require utility connections, and there will be no easements or right-of-way issues on the property · 120 m away
- 110 N Cliff StNov 4, 2025Remodel · 121 m away
- 115 Anthony StAug 26, 2026Only replace roof not replacing anything else · 127 m away
- 108 N Cliff StNov 4, 2025Remodel · 127 m away
- 1216 Noah StDec 3, 2025Electrical per nec · 129 m away
- 1102 Church StAug 28, 2025Install new plumbing · 133 m away