211 E Colorado Blvd
Dallas, TX 75203
Roof replacement permitted at 211 E Colorado Blvd
A residential roofing permit indicates that two layers of shingles and felt will be removed and replaced with new shingles and synthetic felt at 211 E Colorado Blvd. The City of Dallas permit was filed November 4, 2025, under permit RES-ROOF-25-001123.
Summarized from City of Dallas records · updated Nov 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 4, 2025
- since Nov 4, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 211 E Colorado Blvd
What is being built at 211 E Colorado Blvd?
The City of Dallas permit record describes roof work: removing two layers of shingles and felt and installing new shingles and synthetic felt. It does not indicate new construction.
Is a new building going up at 211 E Colorado Blvd in Dallas?
The record is for a residential roofing permit, not a new-building permit. It was filed November 4, 2025.
When was the roofing permit filed for 211 E Colorado Blvd?
The permit was filed with the City of Dallas on November 4, 2025. Its number is RES-ROOF-25-001123.
What roofing work is planned at 211 E Colorado Blvd?
The permit description says two layers of shingles and felt will be removed, then replaced with new shingles and synthetic felt. The record does not provide a project cost or square footage.
Is a business opening at 211 E Colorado Blvd?
The available City of Dallas record describes residential roof replacement work. It does not identify a business or tenant.
Also being built nearby
All of 75203- 203 E Colorado BlvdJul 10, 2025Running power for a mini split ac · 8 m away
- 1325 Englewood DrJun 4, 2025Apply gas pressure test for service reinstatement · 53 m away
- 1327 Englewood DrAug 20, 2026Remodel existing plumbing on fire damaged house · 57 m away
- 1334 Englewood DrOct 29, 2025Re-roof · 68 m away
- 1338 Englewood DrOct 29, 2025Re-roof · 75 m away
- 1306 N Beckley AveAug 7, 2025Furnish and supply like to like gas package unit replacements for the equipment above. * permit * tie down details * with crane service lift new unit to roof * set and secure factory supplied curb adaptors for units that require them * install and secure new unit per code * reconnect new unit to existing electrical and drain lines * install factory supplied hail guards and economizer* connect system to existing ems equipment * install all factory supplied accessories, sensors, smoke detectors and economizers. * reconnect to existing duct work * start unit and verify all operations * verify communications with toc * clean job site * complete final permit inspection · 134 m away
- 1343 Plowman AveNov 6, 2025Electrical no work clean and show · 154 m away
- 1437 Plowman AveOct 30, 2020Remodel existing plumbing · 240 m away
- 1443 Plowman AveOct 30, 2020Remodel existing plumbing · 242 m away
- 1447 Plowman AveOct 30, 2020Remodel existing plumbing · 243 m away
- 1133 N Zang BlvdOct 15, 2020Erect detached sign · 245 m away
- 1411 N Beckley AveOct 15, 2020Interior remodel only- expanding suite #352 · 263 m away