2318 Morrell Ave
Dallas, TX 75203
Fire sprinkler and water service permits at 2318 Morrell Ave
Dallas permits at 2318 Morrell Ave cover installation of a new fire sprinkler system and a water service line to the residence. The commercial alteration permit was filed Oct. 16, 2025, and the residential plumbing permit was filed Apr. 3, 2026.
Summarized from City of Dallas records · updated Apr 3, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 3, 2026
- since Oct 16, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsInstall new water service line from the existing meter valve to the residence main water valve
Install new water service line from the existing meter valve to the residence main water valve
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 2318 Morrell Ave
What is being built at 2318 Morrell Ave?
Permits cover a new fire sprinkler system and a water service line to the residence. The records do not describe a broader construction project.
When were permits filed for 2318 Morrell Ave?
The commercial alteration permit was filed Oct. 16, 2025. The residential plumbing permit followed on Apr. 3, 2026.
Is a new fire sprinkler system being installed at 2318 Morrell Ave?
A City of Dallas commercial alteration permit describes installation of a new fire sprinkler system. The permit number is COM-ALT-ADD-25-001449, filed Oct. 16, 2025.
What does the water service permit at 2318 Morrell Ave cover?
The permit describes a new water service line from the existing meter valve to the residence main water valve. It is permit RES-PLM-26-003566, filed Apr. 3, 2026.
Are there permits for a new building at 2318 Morrell Ave?
The records provided describe a fire sprinkler installation and a water service line, not construction of a new building.
Also being built nearby
All of 75203- 2303 Morrell AveNov 6, 2025New hvac and ductwork · 18 m away
- 2239 Harrell AveJan 10, 2026Gas test · 118 m away
- 2231 Harrell AveMay 8, 2025Replacing riser & weatherhead · 122 m away
- 2406 Childs StJan 22, 2026Replace existing gas distribution piping · 131 m away
- 2839 Cedar Crest BlvdSep 18, 2025Replace copple outles in the front area · 178 m away
- 2103 Morrell AveSep 4, 20264 ton deluxe straight cool gas system upflow complete · 203 m away
- 508 Avenue HOct 23, 2025Replace 3 ton complete gas system · 222 m away
- 2022 Morrell AveMar 23, 2026Re-roof no decking · 225 m away
- 522 Avenue GAug 20, 2025Hvac: complete new 4 ton system electric heat, one dryer vent, 3 bathrooms exhaust fan · 231 m away
- 2219 Mouser StJul 24, 2025Electrical installation in dwelling addition · 235 m away
- 2215 Mouser StDec 2, 2025Gas test · 236 m away
- 2209 Mouser StNov 12, 2025Gas pressure test · 238 m away