334 Leads St
Dallas, TX 75203
Roof shingles to be replaced at 334 Leads St
A City of Dallas permit filed October 14, 2026, indicates the entire roof at 334 Leads St will have its shingles replaced. The record is a residential roofing permit, not a permit for new construction.
Summarized from City of Dallas records · updated Oct 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 14, 2026
- since Oct 14, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 334 Leads St
What work is planned at 334 Leads St in Dallas?
A City of Dallas residential roofing permit indicates the entire roof shingles will be replaced. The permit was filed October 14, 2026.
Is a new home being built at 334 Leads St?
The available permit record is for replacing roof shingles, not for building a new home. It was filed October 14, 2026.
When was the roof permit filed for 334 Leads St?
The City of Dallas permit was filed October 14, 2026. Its permit number is RES-ROOF-26-001727.
What kind of permit was issued for 334 Leads St?
The record identifies it as a residential roofing permit for replacing the entire roof shingles. The listed permit number is RES-ROOF-26-001727.
How much will the roof replacement at 334 Leads St cost?
The permit record does not report a project valuation or cost estimate.
Also being built nearby
All of 75203- 327 Leads StJul 2, 2026Gas leak repair · 22 m away
- 312 Leads StDec 4, 2025Install an electric ac system with duct work · 50 m away
- 311 Leads StFeb 4, 20268’ tall the property has already a fence but i want to install a 8ft fence. i already got approved the certificate of apropietness by dr rhonda dunn the fence will be privacy fence board in board, cedar around 280 lineal ft · 56 m away
- 227 S Cliff StSep 24, 2026Nsfaa-duplex 227/229 s cliff st construction of new duplex · 103 m away
- 308 S Fleming AveJun 23, 2026Nsfaa-residential fire damage repair · 138 m away
- 304 S Fleming AveNov 10, 2026New plumbing underground, top out, and final · 143 m away
- 1120 E Clarendon DrNov 19, 2025The work will consist of installing micropile foundation elements along the exterior portion of the building on the south side near cedar creek. the micropiles will be external to the building and will be connected to the existing building through new pile caps and shotcrete walls in specific areas along the perimeter of the building. additional work not related to the foundation repair work is slope stabilization along cedar creek (city of dallas floodplain alteration permit (fp alt 25-46) already obtained for the project) · 144 m away
- 1119 E 11th StApr 29, 2026I will be building a 8 foot picket fence in the driveway side of the side of the house to keep intruders out · 145 m away
- 212 S Cliff StJan 7, 2026Building an 8ft fence, in some sections, because of slope · 148 m away
- 1123 E 11th StOct 28, 2025Nsfaa-it is a storage unit built separate from existing family home that is 12 feet wide by 15 feet long adding up to 180 square feet · 149 m away
- 1145 Betterton CirSep 24, 2026Nsfaa-duplex-1145/1147 betterton cir construction of a new duplex · 199 m away
- 210 S Fleming AveAug 11, 2026Replace roof and exterior painting · 203 m away