522 Woodbine Ave
Dallas, TX 75203
Plumbing permitted for new residential construction
A plumbing permit for new residential construction at 522 Woodbine Ave was filed on December 18, 2025. The City of Dallas record, RES-PLM-25-009077, says the work is associated with new residential permit RES-NEW-25-001149. A nearby HVAC filing describes systems for duplexes at 520 and 522 Woodbine Ave.
Summarized from City of Dallas records · updated Dec 18, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 18, 2025
- since Dec 18, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 522 Woodbine Ave
What is being built at 522 Woodbine Ave?
A City of Dallas plumbing permit indicates plumbing work associated with a new residential construction permit. A nearby HVAC filing describes duplexes at 520 and 522 Woodbine Ave.
When was the plumbing permit filed for 522 Woodbine Ave?
The permit was filed on December 18, 2025.
What is the permit number for 522 Woodbine Ave?
The plumbing permit number is RES-PLM-25-009077. It is associated with new residential permit RES-NEW-25-001149.
Is 522 Woodbine Ave a duplex?
A nearby HVAC filing describes duplexes at 520 and 522 Woodbine Ave, with two systems total, one for each duplex. The permit at 522 Woodbine Ave is for plumbing associated with new residential construction.
Does the permit record show the project cost or size?
The plumbing permit record does not include a project valuation or square footage.
Also being built nearby
All of 75203- 520 Woodbine AveFeb 12, 2026Hvac mechanical new construction work, which includes rough-in aspects such as (running ductwork, installation of air handler, dryer lines, copper lineset, exhaust fan flex, ac drains, return air and supply boots) as well as trim-out once interior is finished (grille out, condenser setting, start up)3 ton electric system with 10 kw heatfor duplex/es 520/522 woodbine ave (2 systems total, one for each duplex) · 4 m away
- 527 Woodbine AveJul 10, 2025Residential demolition permit · 44 m away
- 1501 Peru StJan 29, 2026Gas test- occupied · 121 m away
- 1502 Peru StSep 23, 2025Install plumbing in new construction home. rough-in, top-out, and final · 131 m away
- 1525 Doyle AveDec 17, 2020Construct new sfd · 152 m away
- 1512 Doyle AveNov 2, 2026New construction · 162 m away
- 1510 Doyle AveSep 16, 2025Drive approach-row · 165 m away
- 1506 Doyle AveMay 19, 2026Complete installation for two a/c systems, 2 ton and 3.5 ton (gas) · 170 m away
- 559 Woodbine AveNov 8, 2023Residential new construction · 171 m away
- 1507 Doyle AveOct 2, 2026New hvac system · 176 m away
- 1503 Doyle AveMar 30, 2026Fencer permit for a section that is 7ft · 182 m away
- 418 Avenue ANov 4, 2026Sfh · 185 m away