613 N Marsalis Ave
Dallas, TX 75203
613 N Marsalis Ave: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 613 N Marsalis Ave, Dallas, TX 75203. The most recent, filed September 16, 2025, covers: “Gas pressure test performed”.
Compiled from City of Dallas records · updated Sep 16, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 16, 2025
- since Sep 16, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 613 N Marsalis Ave
What is being built at 613 N Marsalis Ave?
The latest filing (City of Dallas permit RES-PLM-25-004976, September 16, 2025) covers gas pressure test performed.
How many permits and filings does 613 N Marsalis Ave have?
2 filings across 2 projects, from September 16, 2025 to September 16, 2025.
Is there other construction near 613 N Marsalis Ave?
Yes. Nearby filings include 601 N Marsalis Ave (gas relay or repair with test, Jan 20, 2021); 612 E 5th St (install electrical for new construction, Aug 5, 2026); 626 Blaylock Dr (gas pressure test, Jan 7, 2026).
How do I get alerts for new permits at 613 N Marsalis Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75203- 601 N Marsalis AveJan 20, 2021Gas relay or repair with test · 15 m away
- 612 E 5th StAug 5, 2026Install electrical for new construction · 40 m away
- 626 Blaylock DrJan 7, 2026Gas pressure test · 95 m away
- 705 N Marsalis AveJul 16, 2026Riser was knocked down by a tree during a storm. repair riser and restore power · 126 m away
- 500 N Marsalis AveSep 19, 2025Gas test for 502 but 502 does not show in system, clerk at jefferson said to use 500 as posted on customer gas bill · 129 m away
- 609 N Lancaster AveDec 2, 2020Interior/exterior remodel · 140 m away
- 718 N Marsalis AveNov 5, 2025Mcr interior demolition will include the removal and disposal of fire-damaged materials such as sheetrock, wood framing, and insulation. all affected areas will be carefully dismantled using hand tools (hammers, pry bars, utility knives, and scrapers) to avoid disturbing structural components. debris will be bagged and removed from the site in compliance with safety and waste-disposal regulations · 145 m away
- 722 N Marsalis AveApr 21, 2026Disposal of trash · 150 m away
- 612 N Lancaster AveDec 2, 2020Interior/exterior remodel · 155 m away
- 618 N Lancaster AveMay 30, 2025Replacing main breaker after the storm need disconnect/reconnect 5/2/2025 · 159 m away
- 708 Blaylock DrMay 22, 2025Installing 2 way cleanouts underneath the home · 161 m away
- 716 Blaylock DrOct 15, 2026Pressure test gas piping for unit 4 · 169 m away