811 Morrell Ave
Dallas, TX 75203
Electrical meter bank replacement at 811 Morrell Ave
A permit filed September 22, 2026, covers replacing the existing six-position electrical meter bank at 811 Morrell Ave. The work is to replace heat-damaged and deteriorated components, reconnect existing conductors, and verify grounding and bonding.
Summarized from City of Dallas records · updated Sep 22, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 22, 2026
- since Sep 22, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplace existing six-position electrical meter bank due to heat-damaged and deteriorated electrical components. install new square d six-position meter bank at existing location. reconnect existing service and load-side conductors, replace/terminate breakers as required, verify grounding and bonding, label all meter positions, and coordinate service disconnect/reconnect with oncor. all work to comply with the current city of dallas electrical code, nec, manufacturer requirements, and oncor service requirements
Replace existing six-position electrical meter bank due to heat-damaged and deteriorated electrical components. install new square d six-position meter bank at existing location. reconnect existing service and load-side conductors, replace/terminate breakers as required, verify grounding and bonding, label all meter positions, and coordinate service disconnect/reconnect with oncor. all work to comply with the current city of dallas electrical code, nec, manufacturer requirements, and oncor service requirements
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 811 Morrell Ave
What is happening at 811 Morrell Ave?
A City of Dallas residential electrical permit covers replacement of the existing six-position meter bank. The permit is RES-ELC-26-005849, filed September 22, 2026.
Is a new building being built at 811 Morrell Ave?
The permit describes electrical work at the existing location, not construction of a new building.
Why is the meter bank being replaced?
The permit says the existing electrical components are heat-damaged and deteriorated.
What electrical work is included at 811 Morrell Ave?
The work includes installing a new six-position meter bank, reconnecting existing service and load-side conductors, and replacing or terminating breakers as needed. It also includes verifying grounding and bonding and labeling the meter positions.
When was the electrical permit filed for 811 Morrell Ave?
The City of Dallas permit was filed September 22, 2026. Its permit number is RES-ELC-26-005849.
Does the permit give a project cost or construction area?
No project valuation or square footage is listed in the permit record.
Also being built nearby
All of 75203- 906 S Ewing AveOct 2, 2025New 8' board on board fence for new duplex unit · 19 m away
- 873 S Ewing AveAug 13, 2025Electrical service for a city traffic signal at ewing ave and morrell ave · 45 m away
- 850 S Ewing AveOct 8, 2026Installation of new metal picket fence / rolling metal gate into existing site fence / electrical · 61 m away
- 912 Harlandale AveAug 28, 2025Gas test to have meter unlocked by atmos · 163 m away
- 910 Claude StJul 15, 2026Replace1- 2.5 ton heat pump hvac system · 165 m away
- 914 Claude StAug 18, 2025Residential installation in garage · 169 m away
- 926 Harlandale AveJan 12, 2021Sewer relay · 173 m away
- 939 Harlandale AveSep 23, 2026Gas test for meter release, gas provider requesting city approval · 174 m away
- 922 Claude StJun 2, 2026Install 4 ton (gas) a/c system complete with ductwork · 175 m away
- 930 Harlandale AveNov 5, 2025Gas test · 176 m away
- 725 S Ewing AveAug 27, 2025Install (2) mini splits · 198 m away
- 717 S Ewing AveOct 13, 2020Install 4 new un-manned cabinets / video kiosks, four dot antennas, underground fiber vault power · 205 m away