1215 Skiles St
Dallas, TX 75204
Dallas permit covers a 50-foot side-yard tunnel
A City of Dallas commercial plumbing permit describes a 50-foot tunnel in the side yard at 1215 Skiles St. The permit was filed December 23, 2025, under number COM-PLM-25-003174.
Summarized from City of Dallas records · updated Dec 23, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 23, 2025
- since Dec 23, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1215 Skiles St
What is being built at 1215 Skiles St in Dallas?
A City of Dallas commercial plumbing permit describes a 50-foot tunnel in the side yard. The filing does not specify its purpose.
When was the permit filed for 1215 Skiles St?
The permit was filed December 23, 2025. Its number is COM-PLM-25-003174.
Is the work at 1215 Skiles St a plumbing project?
The record is a commercial plumbing permit and describes a 50-foot side-yard tunnel.
What's being permitted near Cafe Momentum in Dallas?
At 1215 Skiles St, near Cafe Momentum at 3001 Greenwood St, a commercial plumbing permit describes a 50-foot tunnel in the side yard. It was filed December 23, 2025.
How long is the tunnel planned at 1215 Skiles St?
The permit description specifies a 50-foot tunnel in the side yard.
Also being built nearby
All of 75204- 3103 Greenwood StOct 29, 2026Make sewer line repair · 74 m away
- 3102 Greenwood StOct 29, 2020Electrical remodel · 78 m away
- 3206 Live Oak StOct 24, 2025Remove laminate shingles down to the wood decking. install new drip edge, underlayment, starter shingles, and class 4 laminate shingles. install new step flashing and counter flashing to the upper roof brick wall. detach and reset the gutters and downspouts · 91 m away
- 3116 Live Oak StDec 22, 2025Cut and pour new approach · 110 m away
- 3116 Live Oak · 3116 Live Oak LLCAug 28, 2025Candy & schonwalk cpa - exterior remodel — renovation/alteration — small exterior remodel. new entry awning, remove entry stoop and replace with accessible ramp and steps · 110 m away
- 3108 Live Oak StJun 5, 2025Sewer line repairs · 113 m away
- 3310 Live Oak St · 3310 Live Oak, LLCNov 12, 2026Install 1 ton mini-split system. relocate exsisting supply and return grilles asa needed · 125 m away
- 3310 Live Oak Street · 3310 Live Oak, LLCJun 24, 2026Amerismiles expansion — renovation/alteration — interior renovation · 125 m away
- 3310 Live Oak Street · 3310 Live Oak, LLCMay 8, 2026Texas healthcare neck and back — renovation/alteration — interior renovation · 125 m away
- 3320 Live Oak St · Psl Live Oak Dallas LLCApr 15, 2026Site work electrical contracting · 133 m away
- 3320 Live Oak Street · 3320 Live Oak StreetMar 13, 2025Pam rehabilitation hospital of dallas — renovation/alteration — pam rehabilitation hospital is a proposed renovation of an existing 7-story building (68, 514 sq ft) into a 42 bed specialty rehabilitation hospital. the hospital is an inpatient treatment facility · 133 m away
- 1000 Oak StOct 9, 202626.0068 cafe momentum 2nd floorinstall hvac system · 151 m away