2220 Kirby St
Dallas, TX 75204
Home permits cover a water line and mechanical-system replacement
Residential permits at 2220 Kirby St cover replacement of 50 feet of water line and a 2-ton straight-electric system. The plumbing permit was filed October 24, 2025, and the mechanical permit was filed May 11, 2026; the records do not indicate a new building.
Summarized from City of Dallas records · updated May 11, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 11, 2026
- since Oct 24, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2220 Kirby St
What is being built at 2220 Kirby St, Dallas?
The City of Dallas records show home repair and equipment-replacement work, not a new building. The permits cover a 50-foot water line and a 2-ton straight-electric system.
What work was permitted at 2220 Kirby St?
A residential plumbing permit covers replacing 50 feet of water line. A residential mechanical permit covers replacing a 2-ton straight-electric system.
When were permits filed for 2220 Kirby St?
The plumbing permit, RES-PLM-25-006502, was filed October 24, 2025. The mechanical permit, RES-MEC-26-002248, was filed May 11, 2026.
Is a new home being built at 2220 Kirby St?
The available City of Dallas records do not indicate new home construction. They list plumbing and mechanical replacement work.
What does permit RES-MEC-26-002248 cover?
The City of Dallas residential mechanical permit, filed May 11, 2026, describes replacing a 2-ton straight-electric system.
What does permit RES-PLM-25-006502 cover?
The City of Dallas residential plumbing permit, filed October 24, 2025, describes replacing 50 feet of water line.
Also being built nearby
All of 75204- 2215 Kirby StSep 22, 2026To replace a 3 ton heat pump system · 14 m away
- 2211 Kirby StAug 19, 2026Replace 50 gal electric wh · 16 m away
- 2207 Apollonia LnJun 23, 2026Replacing one 3 ton system · 50 m away
- 2227 Eriksson LnJul 8, 2026Install exterior piers to stabilize the foundation · 51 m away
- 2210 Apollonia LnDec 8, 2025Replacing 50 gallon electric water heater · 63 m away
- 4685 Deere StDec 29, 2025Replace the existing wood fence with new wood fencing. a portion of the side yard to be taller than existing fence · 93 m away
- 4654 Deere StJan 23, 2026Install ev charger in garage · 99 m away
- 2312 Kirby StOct 29, 2026Pool plumbing gas heater · 109 m away
- 2314 Kirby StSep 15, 2025Gas test using air pressure · 113 m away
- 2316 Kirby StSep 15, 2025Gas test using air pressure · 116 m away
- 2319 Kirby StJul 9, 2025Performed a gas test , no leak detected · 121 m away
- 2320 Kirby StOct 14, 2026Wire lights & equipment on swimming pool · 123 m away