Cast-iron plumbing replacement at 2311 N Prairie Ave
A residential plumbing permit filed June 27, 2026, covers replacing all cast-iron piping under the home with PVC. The City of Dallas record lists the permit as RES-PLM-26-006626.
Summarized from City of Dallas records · updated Jun 27, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 27, 2026
- since Jun 27, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2311 N Prairie Ave
What is happening at 2311 N Prairie Ave?
A City of Dallas residential plumbing permit covers replacing all cast-iron piping under the home with PVC. The permit was filed June 27, 2026.
Is a new building being constructed at 2311 N Prairie Ave?
The available record is for plumbing work, not a new building. It covers replacing cast-iron piping under the home with PVC.
What does permit RES-PLM-26-006626 cover?
The permit covers replacing all cast-iron piping under the home with PVC. It was filed with the City of Dallas on June 27, 2026.
When was the plumbing permit filed for 2311 N Prairie Ave?
The City of Dallas permit was filed June 27, 2026. The record does not provide a construction start date.
What plumbing work is planned near Bwm Developments on N Fitzhugh Ave?
At 2311 N Prairie Ave, a permit filed June 27, 2026, covers replacing all cast-iron piping under the home with PVC. Bwm Developments is listed at 2325 N Fitzhugh Ave, about 127 meters away.
Also being built nearby
All of 75204- 2305 N Prairie AveNov 10, 2025Tear of composition shingles and install new 30 year shingles back on · 11 m away
- 2304 N Prairie AveJun 25, 2026Install roof mounted pv solar system and energy storage system · 17 m away
- 2316 N Prairie AveJul 24, 2026Nsfaa install 36" cable guardrail (feeney designrail/cablerail per intertek ccrr-0570) at existing 2d level balcony; new rail at open outer edge, cable infill existing frames. no structural work · 17 m away
- 4862 Deere StNov 10, 2020Construct new sfd · 46 m away
- 4866 Deere StNov 5, 2020Construct new sfd · 47 m away
- 2217 N Fitzhugh AveOct 2, 2026Replace main breaker · 105 m away
- 2210 Apollonia LnDec 8, 2025Replacing 50 gallon electric water heater · 106 m away
- 2207 Apollonia LnJun 23, 2026Replacing one 3 ton system · 116 m away
- 2312 Kirby StOct 29, 2026Pool plumbing gas heater · 118 m away
- 2314 Kirby StSep 15, 2025Gas test using air pressure · 118 m away
- 2212 N Fitzhugh AveNov 19, 2025Gas test · 118 m away
- 2316 Kirby StSep 15, 2025Gas test using air pressure · 118 m away