Five townhome units proposed at 2323 Kirby St

A permit filed May 18, 2026, describes five attached, four-story townhome units proposed for 2323 Kirby St. The plans include demolition of existing site improvements and modular, cold-formed steel construction. Electrical and mechanical permits for modular home installation were filed July 22, 2026.

Summarized from City of Dallas records · updated Jul 22, 2026

Projects
4
4 filings
Latest filing
Jul 22, 2026
since May 18, 2026
Largest scope
—
Listed value
—

Permit & project history

4 projects
  1. Installation of duct and terminating electrical connection for a modular home install

    Installation of duct and terminating electrical connection for a modular home install

    City of Dallas permitResidential Mechanical Permit
    Record
    RES-MEC-26-003853
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Electrical work for modular home installation

    Electrical work for modular home installation

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-26-004342
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Installation of modular home wiring and service

    Installation of modular home wiring and service

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-26-004341
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Description of work – 2323 kirby street (kirby townhomes)proposed new construction of five (5) attached multi-family residential townhome units on a 0.19-acre tract located at 2323 kirby street, lot 2r, block e/2011, dallas, dallas county, texas. the project consists of modular, cold-formed steel (cfs) framed construction, four (4) stories in height, designed in accordance with the 2021 international building code ().structural: cold-formed steel framing system with cfs shear walls, floor trusses at 16" o.c., and cfs beam and column assemblies at all four floor levels. foundations consist of slab-on-grade with #4 rebar at 24" o.c. each way, crawlspace footings, and exterior/mid-wall continuous footing details with wedge anchor bolts. structural steel w16x31 beams at first floor. column base plates with 20-inch embedment depth.civil/site: full site demolition of existing improvements including concrete, fencing, and trees (per chief arborist approval). new private concrete paving and drive approaches per city of dallas standards. new public sidewalks, barrier-free ramps, and curb and gutter conforming to tas/ada requirements. site grading with finish floor elevation of 512.20'. storm drainage conveyed to rusk avenue and kirby street via two drainage areas totaling 0.19 acres, with a combined 100-year runoff rate of 1.45 cfs. new water and wastewater service connections per dallas water utilities. street lighting upgrade of existing oncor 100w hps fixture to 55w led. erosion control measures including silt fence, straw bale barriers, and temporary construction entrance.mechanical (hvac): one (1) high-velocity air handler unit (unico v3036b-1ec2b, 3-ton, r-454b refrigerant) and one (1) carrier heat pump outdoor unit (37muhaq36aa3, 36 mbh, 230v/1-phase) installed per residential unit, for a total of five (5) systems. supply and return ductwork routed vertically through all four floors using round sheet metal duct (8"ø supply, 10"ø and 14"ø return). bathroom and kitchen exhaust fans (cook gc-146, 70 cfm each) with dedicated 4"ø and 6"ø exhaust ductwork exhausting through roof via gooseneck terminations with birdscreens. outside air ventilation provided at 77 cfm per unit per imc 403.3.2.1.fire protection: new automatic wet-pipe sprinkler system designed per nfpa-13 and nfpa-13r (2022 editions), light hazard occupancy classification, 0.10 gpm/sq ft density, maximum 144 sq ft per sprinkler head. viking vk concealed pendent quick-response sprinklers throughout all four floors of each unit. system includes a 200 gpm fire pump (ac firepump 4x4x7f), jockey pump, backflow preventer (ames c200 double-check, 3"), butterfly valves with monitor switches, flow switches, pressure switches, and inspector's test and drain valves. fire protection riser serves all four floors with 3" mains, branching to 2", 1-1/4", 1", and 3/4" distribution piping per floor. fire department connection (fdc-1) provided at grade. water supply connected to city potable water line per civil plans

    Description of work – 2323 kirby street (kirby townhomes)proposed new construction of five (5) attached multi-family residential townhome units on a 0.19-acre tract located at 2323 kirby street, lot 2r, block e/2011, dallas, dallas county, texas. the project consists of modular, cold-formed steel (cfs) framed construction, four (4) stories in height, designed in accordance with the 2021 international building code ().structural: cold-formed steel framing system with cfs shear walls, floor trusses at 16" o.c., and cfs beam and column assemblies at all four floor levels. foundations consist of slab-on-grade with #4 rebar at 24" o.c. each way, crawlspace footings, and exterior/mid-wall continuous footing details with wedge anchor bolts. structural steel w16x31 beams at first floor. column base plates with 20-inch embedment depth.civil/site: full site demolition of existing improvements including concrete, fencing, and trees (per chief arborist approval). new private concrete paving and drive approaches per city of dallas standards. new public sidewalks, barrier-free ramps, and curb and gutter conforming to tas/ada requirements. site grading with finish floor elevation of 512.20'. storm drainage conveyed to rusk avenue and kirby street via two drainage areas totaling 0.19 acres, with a combined 100-year runoff rate of 1.45 cfs. new water and wastewater service connections per dallas water utilities. street lighting upgrade of existing oncor 100w hps fixture to 55w led. erosion control measures including silt fence, straw bale barriers, and temporary construction entrance.mechanical (hvac): one (1) high-velocity air handler unit (unico v3036b-1ec2b, 3-ton, r-454b refrigerant) and one (1) carrier heat pump outdoor unit (37muhaq36aa3, 36 mbh, 230v/1-phase) installed per residential unit, for a total of five (5) systems. supply and return ductwork routed vertically through all four floors using round sheet metal duct (8"ø supply, 10"ø and 14"ø return). bathroom and kitchen exhaust fans (cook gc-146, 70 cfm each) with dedicated 4"ø and 6"ø exhaust ductwork exhausting through roof via gooseneck terminations with birdscreens. outside air ventilation provided at 77 cfm per unit per imc 403.3.2.1.fire protection: new automatic wet-pipe sprinkler system designed per nfpa-13 and nfpa-13r (2022 editions), light hazard occupancy classification, 0.10 gpm/sq ft density, maximum 144 sq ft per sprinkler head. viking vk concealed pendent quick-response sprinklers throughout all four floors of each unit. system includes a 200 gpm fire pump (ac firepump 4x4x7f), jockey pump, backflow preventer (ames c200 double-check, 3"), butterfly valves with monitor switches, flow switches, pressure switches, and inspector's test and drain valves. fire protection riser serves all four floors with 3" mains, branching to 2", 1-1/4", 1", and 3/4" distribution piping per floor. fire department connection (fdc-1) provided at grade. water supply connected to city potable water line per civil plans

    City of Dallas permitCommercial New Construction Permit
    Record
    COM-NEW-26-000155
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 2323 Kirby St

What is being built at 2323 Kirby St in Dallas?

A City of Dallas permit describes five attached, four-story townhome units proposed at the address. The new-construction permit is COM-NEW-26-000155, filed May 18, 2026.

How many homes are planned at 2323 Kirby St?

The May 18, 2026, permit describes five attached multifamily townhome units on a 0.19-acre tract.

Are the townhomes at 2323 Kirby St modular?

The permit describes modular, cold-formed steel-framed construction. Two electrical permits and one mechanical permit for modular home installation were filed July 22, 2026.

When was the 2323 Kirby St project permitted?

The new-construction permit was filed May 18, 2026. Electrical and mechanical permits related to modular home installation followed on July 22, 2026.

Will existing buildings be demolished at 2323 Kirby St?

The new-construction permit describes full demolition of existing site improvements, including concrete, fencing and trees, with tree work subject to chief arborist approval.

What do the July 2026 permits for 2323 Kirby St cover?

The City of Dallas filed three permits on July 22, 2026: RES-MEC-26-003853 for duct and electrical connections, and RES-ELC-26-004342 and RES-ELC-26-004341 for electrical work related to modular home installation.