2420 Hugo St
Dallas, TX 75204
Electrical work permitted for an apartment at 2420 Hugo St
A Dallas permit filed July 14, 2025, covers electrical work for Apartment #1 at 2420 Hugo St: adding a subpanel, surge protection and labeling. The records also show earlier water-heater and HVAC alteration permits at the address, not a new-build project.
Summarized from City of Dallas records · updated Jul 14, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Jul 14, 2025
- since Jul 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsApartment number #1 parcel number: 00c81460000700001scope of workadding sub panel, surge protection, labeling
Apartment number #1 parcel number: 00c81460000700001scope of workadding sub panel, surge protection, labeling
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 2420 Hugo St
What is happening at 2420 Hugo St, Dallas?
A permit filed July 14, 2025, covers electrical work for Apartment #1, including a subpanel, surge protection and labeling. Earlier permits record water-heater and HVAC alterations.
Is a new apartment building being built at 2420 Hugo St?
The listed permits describe electrical, plumbing and HVAC alterations. They do not document construction of a new apartment building.
What electrical work was permitted at 2420 Hugo St?
The July 14, 2025, City of Dallas permit, RES-ELC-25-001391, covers adding a subpanel, surge protection and labeling for Apartment #1.
What was the most recent permit for 2420 Hugo St?
The most recent listed permit was filed July 14, 2025. Permit RES-ELC-25-001391 covers electrical work for Apartment #1.
What other work has been permitted at 2420 Hugo St?
Records show a water-heater installation permit filed August 24, 2020 (2008243067) and HVAC alteration permits filed May 18, 2020 (2005183036) and September 16, 2019 (1909163037).
What is happening near Ionna at 2500 N Hall St?
The records list a separate project at 2500 N Hall St for a new EV charging hub, with seven chargers serving 14 stalls, a canopy, convenience store, restroom building, signage and electrical equipment. It is about 96 meters from 2420 Hugo St.
Also being built nearby
All of 75204- 3205 State StJul 8, 2026Removal of existing hvac system and installation of new hvac system · 23 m away
- 3132 State StFeb 24, 2026Full reroof · 80 m away
- 3126 State StFeb 24, 2026Full reroof · 85 m away
- 2411 N Hall StOct 29, 2026Hvac replacement. install 1.5 ton heat pump complete system · 87 m away
- 3124 State StFeb 24, 2026Full reroof · 87 m away
- 3120 State StFeb 24, 2026Full reroof · 90 m away
- 3116 State StFeb 24, 2026Full reroof · 93 m away
- 2500 N Hall St · Ionna LLCSep 17, 2026Ionna tx-0003 2500 n hall st dallas tx — new construction — new ev charging hub, approx. 2,800 sq ft - 7 chargers serving 14 stalls, canopy, c-store, restroom building, signage and electrical equipment · 96 m away
- 3112 State StFeb 24, 2026Full reroof · 97 m away
- 3304 State StNov 2, 20261. install new sanitary drain line with 4” schedule 40 pvc pipe for new restrooms and convenient store from each building to wye connection point and connect to main sanitary sewer connection left by utility contractor located approx. 100 feet away 2. install new 1” zurn pex water line for new restrooms and connect to 2” water meter located approx. 10 feet away.3. connect and run condensate drain line for ac units for restrooms to lavatory p-trap with schedule 80 pvc. 4. provide and install new 4” hub drain with wire mesh cover for condensate drains line discharge in convenient store.5. provide and install the following plumbing fixtures: two kohler k-2084-0 wall mounted lavatory sink with kohler k-13461-cp battery powered faucet. two american standard cadet pro ada floor mounted water closet with pressure assistant tank and open front seat.three 3” sioux chief pvc floor drain with trap guard and stainless-steel strainer one 4” lateral cleanouttwo chonomite instant hot water heater for lavatories · 98 m away
- 3221 Hugo PlJun 18, 2026Installing 6 pilings · 99 m away
- 3225 Hugo PlJun 18, 2026Installing 5 pilings · 100 m away