groundranger
Active · latest filing Sep 2026Commercial

2815 Cole Ave

Dallas, TX 75204

Washer-dryer installations listed under MCR Phase 4

A City of Dallas permit labeled MCR Phase 4 (2815 Cole Ave) describes installing ventless washer-dryer units in four existing occupied dwelling units. The permit was filed September 4, 2026, and lists work at units on Cole Avenue and Sneed Street, including laundry-area conversions and plumbing and electrical work.

Summarized from City of Dallas records · updated Sep 4, 2026

Projects
1
1 filings
Latest filing
Sep 4, 2026
since Sep 4, 2026
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. Mcr phase 4 (2815 cole ave) consists of interior alterations to four (4) existing occupied dwelling units (3007 cole ave units 104 & 106, 3015 cole ave unit 227, and 3104 sneed st unit 114) for the installation of ventless combination washer/dryer units. work includes conversion of an existing closet adjacent to the bathroom into a laundry area, installation of a new electrical branch circuit from the existing electrical panel, extension of domestic hot and cold water lines from the existing bathroom plumbing, connection of the appliance drain to the existing sanitary drainage system, drywall, and finish repairs. no structural modifications, exterior alterations, changes to the building footprint, occupancy, or use are proposed

    Mcr phase 4 (2815 cole ave) consists of interior alterations to four (4) existing occupied dwelling units (3007 cole ave units 104 & 106, 3015 cole ave unit 227, and 3104 sneed st unit 114) for the installation of ventless combination washer/dryer units. work includes conversion of an existing closet adjacent to the bathroom into a laundry area, installation of a new electrical branch circuit from the existing electrical panel, extension of domestic hot and cold water lines from the existing bathroom plumbing, connection of the appliance drain to the existing sanitary drainage system, drywall, and finish repairs. no structural modifications, exterior alterations, changes to the building footprint, occupancy, or use are proposed

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-002149
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 2815 Cole Ave

What is being built at 2815 Cole Ave?

A City of Dallas permit labeled MCR Phase 4 describes washer-dryer installations in four existing occupied dwelling units. The listed work includes converting closets into laundry areas; it does not propose changes to the buildings’ use or occupancy.

When was the 2815 Cole Ave permit filed?

Permit COM-ALT-ADD-26-002149 was filed September 4, 2026.

Which units are included in the MCR Phase 4 permit?

The permit lists units 104 and 106 at 3007 Cole Ave, unit 227 at 3015 Cole Ave, and unit 114 at 3104 Sneed St.

What work does permit COM-ALT-ADD-26-002149 cover?

It covers installation of ventless combination washer-dryer units, including new electrical branch circuits, water-line extensions, drain connections, and finish repairs. The permit says no structural or exterior alterations are proposed.

What work is planned at 2815 Cole Ave near Hillwood Suite 350 Expansion?

The permit record labeled MCR Phase 4 (2815 Cole Ave) describes laundry-area alterations in four occupied units at 3007 Cole Ave, 3015 Cole Ave, and 3104 Sneed St. It was filed September 4, 2026.

Also being built nearby

All of 75204
Get alerts for 2815 Cole Ave