3302 Gaston Ave
Dallas, TX 75204 · Texas A&m University Main Building Renovation, Texas A&m University - Sod Aru Deferred Maint. + Reno. Scope + 2 more
Renovations registered at Texas A&M’s dentistry building
Two renovation projects are registered for this multi-tenant property, including work in targeted areas of the existing eight-story Texas A&M School of Dentistry building. Both were filed with TDLR on September 3, 2024; one covers 26,000 square feet, and the other includes AHU deferred maintenance and fourth-floor renovations.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 3, 2024
- Projects
- 4
- 4 filings
- Latest filing
- Sep 3, 2024
- since Sep 3, 2024
- Largest scope
- 26,000 sf
- Estimated cost
- $14M
- state registration
Where this project stands
Inspected · closing outTexas A&M University Main Building Renovation
26,000 sq ft · $14M est.
- RegisteredSep 3, 2024
- Plan review
- ConstructionOct '24 – Jan '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
4 projectsThe proposed renovation of the school of dentistry main building involves targeted areas of the existing eight-story building. — texas a&m school of dentistry
TDLR project registrationRenovation/AlterationInspection Complete26,000 sq ft$14M est.- Project #
- TABS2025000070
- Tenant / owner
- Texas A&m University Main Building Renovation
- Design firm
- Pro
- Contact
- Pro
Ahu deferred maintenance and 4th floor renovations — texas a&m school of dentistry
TDLR project registrationRenovation/AlterationReview Complete1,000 sq ft$1.5M est.- Project #
- TABS2025000069
- Tenant / owner
- Texas A&m University - Sod Aru Deferred Maint. + Reno. Scope
- Design firm
- Pro
- Contact
- Pro
The university of texas a&m is renovating a portion of the existing first floor. the renovation will add a student affairs office space. this will include new offices, a breakroom, a conference room, an interview room, and a new reception area. — texas a&m university baylor college of dentistry
TDLR project registrationRenovation/AlterationProject Closed6,000 sq ft$500K est.- Project #
- TABS2024001124
- Tenant / owner
- Tamu Hsc Sod - Renovation Student Affairs
- Design firm
- Pro
- Contact
- Pro
Renovation of suite 160. demolishing existing walls, fixtures and hvac systems. building new walls, installing new fixtures and hvac systems. — texas a&m university baylor college of dentistry
TDLR project registrationRenovation/AlterationInspection Complete1,700 sq ft$500K est.- Project #
- TABS2023024853
- Tenant / owner
- Tamu Hsc Sod - Renovation Of Suite 160
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3302 Gaston Ave
What is being renovated at 3302 Gaston Ave?
TDLR records list two renovation projects, including targeted work in the existing eight-story Texas A&M School of Dentistry building and a separate scope for AHU deferred maintenance and fourth-floor renovations. Both were filed September 3, 2024.
Is Texas A&M building a new building at 3302 Gaston Ave?
The TDLR records describe renovations to existing space, not a new building. One project covers targeted areas of an existing eight-story building.
When were the renovation projects filed?
Both TDLR project registrations were filed September 3, 2024. The main building renovation is listed as inspection complete, while the separate deferred-maintenance and renovation scope is listed as review complete.
How much will the renovations at 3302 Gaston Ave cost?
The applicant estimated $14 million for the 26,000-square-foot main building renovation. A separate 1,000-square-foot scope has a $1.5 million estimate.
How many projects are registered at this address?
The records show two TDLR renovation registrations, both dated September 3, 2024: TABS2025000070 and TABS2025000069.
What is being renovated near Baylor University Medical Center on Gaston Avenue?
At 3302 Gaston Ave, TDLR records describe renovations to the Texas A&M School of Dentistry’s existing building, including targeted areas and fourth-floor work. Baylor University Medical Center is listed about 146 meters away.
Also being built nearby
All of 75204- 3302 Gaston Ave · Baylor University Medical CenterFeb 5, 2025Tamu hsc cod - renovation pediatrics — renovation/alteration — the university of texas a&m is renovating a portion of the existing second floor. the renovation will add a new pediatrics office suite. this will include new offices, a breakroom, a conference room, and a new reception area
- 3302 Gaston Ave · Baylor University Medical CenterOct 27, 2026Tamu hsc - oral clinic — renovation/alteration — the renovation of the existing suite 145 approximately 5,350 sq ft of a group occupancy b, into a group b occupancy dental clinic (university area) use, located at the texas a&m college of dentistry. interior only remodeling, no change to exterior
- 3301 Gaston AveSep 19, 2025Add ten exit light locations as required · 13 m away
- 3200 Gaston AveJun 26, 2026Electrical service new · 84 m away
- 3417 Gaston Avenue · Medbuilding LtdAug 14, 2026Plains capital bank pcb baylor / gaston — renovation/alteration — interior tenant finish-out of an existing one story building. scope of work includes interior construction and, mep modifications. 3,800 sq ft · 85 m away
- 3417 Gaston Ave · Medbuilding, Ltd.Oct 29, 2026Interior finish out of existing suite · 85 m away
- 3500 Gaston AveJan 22, 2021Install access control to 15 door locations on 1st floor roberts building pathology area · 146 m away
- 3500 Gaston Avenue · Baylor University Medical CenterJan 5, 2026Bumc ortho residents — renovation/alteration — renovate shared offices and rehab space · 146 m away
- 3500 Gaston Ave · Baylor Scott & White HealthMar 26, 2025Bumc central pharmacy renovation - added scope — renovation/alteration — enovation of existing restrooms, locker room, and narcotic vault within the pharmacy suite, and addition of one restroom and trash room · 146 m away
- 3500 Gaston Avenue · Baylor University Medical CenterSep 30, 2026Bumc ed upgrades — renovation/alteration — renovate emergency department entrance · 146 m away
- 3500 Gaston AveNov 16, 2026Phase 3 · 146 m away
- 3111 Floyd StOct 5, 2020Service release no work · 165 m away