4001 Capital Ave Dallas, Texas
Dallas, TX 75204 · Dallas ISD
Spence Middle School renovation registered in Dallas
A renovation at Spence Middle School and TAG is planned at 4001 Capital Ave in Dallas. The TDLR project registration, filed August 15, 2024, lists replacement of HVAC units, exterior lights, the fire alarm, an exterior sign, and windows and glazing.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 15, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 15, 2024
- since Aug 15, 2024
- Largest scope
- 1,500 sf
- Estimated cost
- $4.3M
- state registration
Where this project stands
In state plan reviewSpence Middle School Renovation
1,500 sq ft · $4.3M est.
- RegisteredAug 15, 2024
- Plan reviewnow
- ConstructionFeb '25 – Jul '26
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectAdditional maintenance scope - replacement of hvac units, replacement of exterior lights, replacement of fire alarm. replacement of exterior sign. replacement of windows / glazing — alex spence middle school & tag
TDLR project registrationRenovation/AlterationProject Registered1,500 sq ft$4.3M est.- Project #
- TABS2024025519
- Tenant / owner
- Spence Middle School Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4001 Capital Ave Dallas, Texas
What is being built at 4001 Capital Ave in Dallas?
A TDLR registration describes a renovation at Spence Middle School and TAG, including replacement of HVAC units, exterior lights, the fire alarm, an exterior sign, and windows and glazing. It was registered August 15, 2024, as project TABS2024025519.
When was the Spence Middle School renovation registered?
The TDLR project registration was filed August 15, 2024. The record lists the project as registered.
What work is planned for Spence Middle School and TAG?
The registration lists replacement of HVAC units, exterior lights, the fire alarm, an exterior sign, and windows and glazing.
How much is the Spence Middle School renovation estimated to cost?
The TDLR registration lists an applicant-estimated project cost of $4,256,886. This is an estimate, not a confirmed final cost.
Is the Spence Middle School renovation near Kroger on Capitol Ave?
The project address is 4001 Capital Ave, and Kroger Texas at 4241 Capitol Ave is listed about 121 meters away.
Also being built nearby
All of 75204- 4001 Capitol AveSep 23, 2026Admin bathroom demolition and renovation.water closet, lavatory, and floor drain
- 3940 Capitol AveAug 28, 2025Install two, approx 16ft wide, automated gates. material is ornamental steel. gates are 6-8ft tall and include knox locks for emergency vehicle access. gates are located on the north/northwest and southeast entrances to the east parking lot. also includes two short sections of ornametnal steel fence, approx 6 linear ft and 6ft tall each, on either side of the south entrance gate · 33 m away
- 2500 N Haskell AveAug 24, 2026Remove & replace (1) mini split system like for like · 50 m away
- 4241 Capitol AveJul 20, 2026Minor interior remodel of an existing grocery store · 121 m away
- 4241 Capitol Ave · Kroger Texas LPFeb 4, 2026Kroger #529 remodel — renovation/alteration — minor interior remodel of an existing grocery store. interior scope of work consists of new and relocated equipment/fixtures · 121 m away
- 4144 Office PkwySep 17, 2026Furnish and install 2" double check backflow device underground at exit of the property. set up testing for new device and schedule inspection once device passes testing · 154 m away
- 2711 N Haskell AveJul 8, 2026Qteam meeting 7.16.26 (all day) restriping and refinishing of existing parking garage on certain levels · 157 m away
- 2711 N Haskell Avenue · Cp Land Owner LLCJun 10, 2026Cityplace apron - garage — renovation/alteration — re-striping and refreshing finishes in the garage, on certain levels · 157 m away
- 2711 N Haskell Avenue · Cp Land Owner LLCJun 8, 2026Cityplace apron - haskell — new construction — 206 residential units, approximately 235,500 total gsf includes approximately 5000 sq ft of amenity spaces. 5 levels of type 3a, over type 1 a podium · 157 m away
- 4108 Office PkwyNov 30, 2025Install 40 gallon electric water heater · 157 m away
- 4242 Office PkwyOct 2, 2026Annual gas test · 167 m away
- 4318 Capitol AveApr 6, 2026Update the electrical service · 184 m away