Eight Level 2 charging stations planned at 4030 N Central Expy
A City of Dallas permit filed October 26, 2026, describes installation of eight customer-supplied Level 2 charging stations at 4030 N Central Expy. The work also includes electrical circuits, conduit, routers and safety switches.
Summarized from City of Dallas records · updated Oct 26, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 26, 2026
- since Oct 26, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectBu zo el install (8) (customer supplied) level two charging stations. (load share)install (3) 240v 40a circuits with copper conductors to feed the stations.install (150') of 3/4" conduits from existing panel to stations 1-6.install (4) (customer supplied) router with 120v circuits.install (3) 40a nema 3 safety switches
Bu zo el install (8) (customer supplied) level two charging stations. (load share)install (3) 240v 40a circuits with copper conductors to feed the stations.install (150') of 3/4" conduits from existing panel to stations 1-6.install (4) (customer supplied) router with 120v circuits.install (3) 40a nema 3 safety switches
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 4030 N Central Expy
What is being installed at 4030 N Central Expy?
A City of Dallas permit describes installation of eight customer-supplied Level 2 charging stations, along with related electrical work. The permit was filed October 26, 2026.
When was the charging station permit filed?
The City of Dallas filed permit COM-ALT-ADD-26-002611 on October 26, 2026.
How many charging stations are planned at 4030 N Central Expy?
The permit describes eight customer-supplied Level 2 charging stations.
What electrical work is included in the permit?
The description includes three 240-volt circuits, 150 feet of conduit, four customer-supplied routers with 120-volt circuits, and three 40-amp safety switches.
What's being installed next to Reliant Cellular on North Central Expressway?
A permit for 4030 N Central Expy, about 25 meters from Reliant Cellular at 4040 North Central Expressway, describes eight Level 2 charging stations and related electrical work.
Also being built nearby
All of 75204- 4040 North Central Expressway · Areit Re 4040 Ncx LLCOct 17, 2024Spec suite 410 — renovation/alteration — interior finish out · 25 m away
- 4040 N. Central Expressway 9th · Areit Re 5050 Ncx LLCMay 3, 20249th floor corridor, restrooms & lobby — renovation/alteration — capital improvement · 25 m away
- 4040 North Central Expressway · Areit Re 4040 Ncx LLCOct 28, 2026Reliant cellular — renovation/alteration — renovation of interior commercial office space within high rise building · 25 m away
- 4040 N Central Expy · Shops At Woodcreek LLCNov 3, 2026Mcr remodel of existing commercial office space · 25 m away
- 4009 N Central ExpyJan 25, 2021Remove existing roof and install new roof · 199 m away
- 4050 Mckinney AveJan 27, 2021Replace or modify existing hvac · 202 m away
- 4114 N Central ExpyMar 5, 2026Recover of the existing roof system. we will install a layer of flute filler, one layer of polyiso and tpo, rhinobonded into the purlins · 211 m away
- 4510 Coles Manor StDec 15, 2020Install fence · 232 m away
- 4608 Coles Manor PlOct 22, 2025Replace existing hvac system · 255 m away
- 4061 N Central ExpyNov 5, 2025Gas test · 260 m away
- 3966 Mckinney AveMar 19, 2026Replace1 1/4" rpz in north east basement · 268 m away
- 4110 Mckinney AveNov 13, 2026No new work, need electrical service release · 281 m away