4152 Cole Avenue
Dallas, TX 75204 · Wri 4152 Cole LLC
Alpha School renovation planned for 4152 Cole Avenue
A tenant improvement project for Alpha School is registered for the approximately 2,824-square-foot educational facility at 4152 Cole Avenue. The TDLR registration was filed May 12, 2026, and lists interior alterations including wall demolition, new flooring, millwork and paint. The project is marked inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated May 12, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 12, 2026
- since May 12, 2026
- Largest scope
- 2,824 sf
- Estimated cost
- $125K
- state registration
Where this project stands
Inspected · closing outAlpha School - Dallas, TX
2,824 sq ft · $125K est.
- RegisteredMay 12, 2026
- Plan review
- ConstructionJun '26 – Jul '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectTenant improvement project of an approximately 2,824 sq ft educational facility. the scope includes alterations to the ground level space including the demolition of three front walls to non-bearing interior walls, new floor finish, millwork and paint. — alpha school
TDLR project registrationRenovation/AlterationInspection Complete2,824 sq ft$125K est.- Project #
- TABS2026020014
- Tenant / owner
- Alpha School - Dallas, TX
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4152 Cole Avenue
What is being built at 4152 Cole Avenue in Dallas?
TDLR records describe a tenant improvement project for an approximately 2,824-square-foot educational facility for Alpha School. The work includes interior alterations, new flooring, millwork and paint.
Is Alpha School opening at 4152 Cole Avenue?
The TDLR registration identifies Alpha School as the project tenant and describes the site as an educational facility. The record does not give an opening date.
When was the 4152 Cole Avenue project filed?
The TDLR project registration, TABS2026020014, was filed May 12, 2026. Its status is listed as inspection complete.
What renovation work is planned at 4152 Cole Avenue?
The registration describes demolition of three front walls, along with new floor finishes, millwork and paint. It identifies the work as a renovation and alteration.
How much will the Alpha School project at 4152 Cole Avenue cost?
The TDLR registration lists an applicant-estimated project cost of $125,000. This is an estimate, not a confirmed final cost.
Also being built nearby
All of 75204- 4152 Cole AveJun 25, 2026Pvt alpha school tenant improvement project of a former veterinary eye clinic into a new private educational facility serving students k-8. work includes: demolition of non-load bearing walls, new flooring and paint and millwork
- 4136 Cole AveJan 13, 2026Need to get electricity back on.we are not ding any electrical work · 38 m away
- 4132 Cole AveSep 25, 2026Wire running to meter box being repaired · 47 m away
- 4124 Cole AveSep 30, 2025Tub and valve replacement · 66 m away
- 4116 Cole AveNov 14, 2025Install (1) 40 gal elec water heater in attic (change out) · 85 m away
- 4111 Cole AveJun 22, 2026Replace 2 ton above the tub unit · 100 m away
- 3219 N Fitzhugh AveDec 22, 2020Repair sewer line back of building to correct backfall · 114 m away
- 4122 Travis StDec 1, 2025Hvac change out – remove two existing up-flow straight-electric systems. install two new matched systems (indoor + outdoor), reusing existing ductwork. install units per manufacturer specifications. attic installation · 133 m away
- 4134 Travis StNov 28, 2025We are replacing 100 amp main electrical panel in unit due to corrosion found on main lugs · 136 m away
- 4203 Cole AveMay 23, 2025I need to get service release clean and show for electric · 140 m away
- 3267 N Fitzhugh AveDec 16, 2020Permanent electrical service · 145 m away
- 4121 Mckinney AveApr 3, 2026Replace 4 ton complete · 147 m away