4206 Cabell Dr
Dallas, TX 75204
Gas pressure test permit at 4206 Cabell Dr
A City of Dallas residential plumbing permit at 4206 Cabell Dr covers a gas pressure test for a gas release. The permit was filed on January 16, 2026.
Summarized from City of Dallas records · updated Jan 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 16, 2026
- since Jan 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4206 Cabell Dr
What is happening at 4206 Cabell Dr?
A City of Dallas residential plumbing permit describes a gas pressure test for a gas release. It was filed on January 16, 2026.
Is a new home being built at 4206 Cabell Dr?
The available record does not describe new home construction. It lists a residential plumbing permit for a gas pressure test.
What kind of permit was filed at 4206 Cabell Dr?
The record is a Residential Plumbing Permit from the City of Dallas, permit RES-PLM-26-000639.
When was the permit filed for 4206 Cabell Dr?
The City of Dallas permit was filed on January 16, 2026.
Does the 4206 Cabell Dr permit describe a gas pressure test?
Yes. Its description is “Gas pressure test for gas release.”
Also being built nearby
All of 75204- 4211 Cabell DrFeb 19, 2026Ivy urban living- building. 6- foundation repair- installing 62 ext. pilings · 60 m away
- 4307 Cabell DrFeb 18, 20265 ton 15seer full replacement · 82 m away
- 4315 Cabell DrDec 9, 2025Replacement of 40 gallon electric water heater · 91 m away
- 4325 Cabell DrJun 13, 2025Water heater replacement · 101 m away
- 4306 Deere StJul 29, 2025Water and sewer service · 139 m away
- 4315 Deere StNov 5, 202597 feet of of 6ft tall commercial grade iron fence and one gate to match existing fence · 155 m away
- 2300 N Haskell AveJan 20, 2021Install sprinkler monitoring system · 166 m away
- 4109 Lafayette StOct 5, 2026Install 550 sqf of tpo roof overlay · 167 m away
- 2106 N Haskell AveJun 23, 2026Water heater 55 gal electric · 170 m away
- 4242 Office PkwyOct 2, 2026Annual gas test · 182 m away
- 4144 Office PkwySep 17, 2026Furnish and install 2" double check backflow device underground at exit of the property. set up testing for new device and schedule inspection once device passes testing · 183 m away
- 2101 N Haskell AveFeb 23, 2026Building 4 install 92 steel pilings · 184 m away