groundranger
Recent · latest filing Sep 2025Residential

4511 Capitol Ave

Dallas, TX 75204

Residential sewer, driveway and fence work at 4511 Capitol Ave

City of Dallas permits at 4511 Capitol Ave describe residential plumbing work, a new driveway approach and an 8½-foot wood fence. The first filing was June 2, 2025, and the latest was September 22, 2025, for rough below-ground work related to a sewer connection.

Summarized from City of Dallas records · updated Sep 22, 2025

Projects
6
6 filings
Latest filing
Sep 22, 2025
since Jun 2, 2025
Largest scope
—
Listed value
—

Permit & project history

6 projects
  1. Rough below ground outside of foundation for sewer connection

    Rough below ground outside of foundation for sewer connection

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-25-005176
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Plumbing final 210 reinspection for bonded contractor to be able to tie the sewer line

    Plumbing final 210 reinspection for bonded contractor to be able to tie the sewer line

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-25-005054
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. 8 1/2' wood fence on steel posts

    8 1/2' wood fence on steel posts

    City of Dallas permitResidential Accessory Structure Permit
    Record
    RES-ACC-25-000294
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Re-inspect gas line

    Re-inspect gas line

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-25-002083
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. New driveway approach

    New driveway approach

    City of Dallas permitResidential Drive Approach and Sidewalk Permit
    Record
    RES-DSW-25-000196
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Ew release

    Ew release

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-25-000481
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 4511 Capitol Ave

What work is permitted at 4511 Capitol Ave?

City of Dallas records list residential plumbing work, a gas-line reinspection, a new driveway approach and an 8½-foot wood fence. The records include six permits filed between June 2 and September 22, 2025.

Is a new home being built at 4511 Capitol Ave?

The permits provided do not identify new home construction. They describe residential plumbing and accessory work, including sewer connection work, a driveway approach and a fence.

What sewer work is planned at 4511 Capitol Ave?

A September 22, 2025 permit describes rough below-ground work outside the foundation for a sewer connection. A September 18 permit describes a plumbing final reinspection so the contractor could tie in the sewer line.

When were permits filed for 4511 Capitol Ave?

The earliest listed permit was filed June 2, 2025, and the latest was filed September 22, 2025. All six records are from the City of Dallas.

Is there a project cost listed for 4511 Capitol Ave?

The records provided do not include a reported valuation or an estimated total project cost.

Also being built nearby

All of 75204
Get alerts for 4511 Capitol Ave