4511 Capitol Ave
Dallas, TX 75204
Residential sewer, driveway and fence work at 4511 Capitol Ave
City of Dallas permits at 4511 Capitol Ave describe residential plumbing work, a new driveway approach and an 8½-foot wood fence. The first filing was June 2, 2025, and the latest was September 22, 2025, for rough below-ground work related to a sewer connection.
Summarized from City of Dallas records · updated Sep 22, 2025
- Projects
- 6
- 6 filings
- Latest filing
- Sep 22, 2025
- since Jun 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsSources: City of Dallas
Questions about 4511 Capitol Ave
What work is permitted at 4511 Capitol Ave?
City of Dallas records list residential plumbing work, a gas-line reinspection, a new driveway approach and an 8½-foot wood fence. The records include six permits filed between June 2 and September 22, 2025.
Is a new home being built at 4511 Capitol Ave?
The permits provided do not identify new home construction. They describe residential plumbing and accessory work, including sewer connection work, a driveway approach and a fence.
What sewer work is planned at 4511 Capitol Ave?
A September 22, 2025 permit describes rough below-ground work outside the foundation for a sewer connection. A September 18 permit describes a plumbing final reinspection so the contractor could tie in the sewer line.
When were permits filed for 4511 Capitol Ave?
The earliest listed permit was filed June 2, 2025, and the latest was filed September 22, 2025. All six records are from the City of Dallas.
Is there a project cost listed for 4511 Capitol Ave?
The records provided do not include a reported valuation or an estimated total project cost.
Also being built nearby
All of 75204- 4517 Capitol AveApr 21, 2026Demolition of existing structure at 4517 & 4519 capitol ave dallas tx 75204 · 8 m away
- 4510 Capitol AveMay 12, 2025Gas repair at 2 90s going directly under home · 15 m away
- 4502 Capitol AveSep 26, 2020Swimming pool installation · 16 m away
- 4527 Capitol AveJul 25, 20253.5 ton condenser · 22 m away
- 2323 N Carroll AveJun 19, 2026Nsfaa 7'x12" concrete bollards 3' into the ground and 4' feet from the ground up.#3 rebar case rebar3000 psi concrete smooth finish this is done to for safe purposes on a busy street in front of house (north carroll ave, ) · 98 m away
- 4535 Weldon StNov 10, 2020Grading only · 107 m away
- 4519 Weldon StJun 20, 2025Install hvac complete system with ductwork · 108 m away
- 4517 Weldon StAug 1, 2025Construct new 8ft cedar wood fence · 108 m away
- 4513 Weldon StOct 15, 2020Demolition sfd · 109 m away
- 4414 Capitol AveDec 4, 2020Install new plumbing · 125 m away
- 4411 Rusk AveFeb 4, 2026Gas line to pool heater · 126 m away
- 4407 Rusk AveJul 11, 2025Replacing a 3.5 ton heat pump complete system · 129 m away