778 Lacey Oaks Pl
Dallas, TX 75204
778 Lacey Oaks Pl: 1 project on record
City of Dallas lists 1 filing across 1 project at 778 Lacey Oaks Pl, Dallas, TX 75204. The most recent, filed July 29, 2025, covers: “Complete system replacement”.
Compiled from City of Dallas records · updated Jul 29, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 29, 2025
- since Jul 29, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 778 Lacey Oaks Pl
What is being built at 778 Lacey Oaks Pl?
The latest filing (City of Dallas permit RES-MEC-25-001592, July 29, 2025) covers complete system replacement.
How many permits and filings does 778 Lacey Oaks Pl have?
1 filing across 1 project, from July 29, 2025 to July 29, 2025.
What is being built near Meadows Foundation in Dallas?
778 Lacey Oaks Pl is about 93 m from Meadows Foundation (2918 Live Oak St). Its latest filing is for complete system replacement.
Is there other construction near 778 Lacey Oaks Pl?
Yes. Nearby filings include 2918 Live Oak St (install walk-in refrigeration, Dec 5, 2025); 3108 Live Oak St (sewer line repairs, Jun 5, 2025); 1303 Birkenhead Ct (200 amp panel replacement, Oct 5, 2026).
How do I get alerts for new permits at 778 Lacey Oaks Pl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75204- 2918 Live Oak St · Meadows Foundation Inc.Dec 5, 2025Install walk-in refrigeration · 93 m away
- 3108 Live Oak StJun 5, 2025Sewer line repairs · 96 m away
- 1303 Birkenhead CtOct 5, 2026200 amp panel replacement · 97 m away
- 3116 Live Oak · 3116 Live Oak LLCAug 28, 2025Candy & schonwalk cpa - exterior remodel — renovation/alteration — small exterior remodel. new entry awning, remove entry stoop and replace with accessible ramp and steps · 101 m away
- 3116 Live Oak StDec 22, 2025Cut and pour new approach · 101 m away
- 3120 Carmel StJun 18, 2025Replace 1.5 ton heat pump fur down unit on roof · 107 m away
- 3122 Carmel StDec 2, 2025Replaced 40 gallon electric water heater in the garage overhead · 108 m away
- 3018 Bryan StNov 6, 2020Electrical repairs · 113 m away
- 3030 Bryan StOct 29, 2026Replace 5 ton hvac unit · 113 m away
- 3001 Greenwood St · Cafe MomentumNov 10, 2025Cafe momentum - dallas — new construction — new two-story, ground-up building featuring a restaurant with a commercial kitchen on the first floor and training/offices on the second floor · 154 m away
- 1000 Oak StOct 9, 202626.0068 cafe momentum 2nd floorinstall hvac system · 154 m away
- 1321 Skiles StJul 24, 2026Shower to shower replacement with new valve · 160 m away