4307 Mckinney Ave
Dallas, TX 75205
Stucco repairs and equipment work at 4307 McKinney Ave
Permits at 4307 McKinney Ave indicate stucco removal and exterior repairs to both buildings, filed December 16, 2025. Earlier 2025 permits cover replacement of 3-ton and 1.5-ton equipment and installation of a 50-gallon gas water heater.
Summarized from City of Dallas records · updated Dec 16, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Dec 16, 2025
- since Dec 16, 2020
- Largest scope
- —
- Listed value
- $15
- partial · often understated
Permit & project history
4 projectsMcr i am to do demolition of certain areas of stucco. where we are then to make repairs of stucco around the exterior of both buildings from units 1-14 patches vary on sizes frpm 3'x4' up to 6'x8' depending on damages
Mcr i am to do demolition of certain areas of stucco. where we are then to make repairs of stucco around the exterior of both buildings from units 1-14 patches vary on sizes frpm 3'x4' up to 6'x8' depending on damages
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 4307 Mckinney Ave
What is being built at 4307 McKinney Ave?
The permits describe repair and equipment work, not a new building. A December 16, 2025, permit covers removing damaged stucco and repairing the exteriors of both buildings.
Is there demolition planned at 4307 McKinney Ave?
A permit describes demolition of certain stucco areas before exterior repairs. It does not describe demolition of the buildings.
What work is included in the December 2025 permit?
Permit COM-ALT-ADD-25-001688, filed December 16, 2025, covers stucco patches of varying sizes on the exteriors of both buildings, serving units 1–14.
Were there other permits for 4307 McKinney Ave in 2025?
Yes. A July 3, 2025, plumbing permit covers installation of a 50-gallon gas water heater. An August 25, 2025, mechanical permit covers replacement of 3-ton and 1.5-ton equipment.
What work is happening near the Garden, Narthex, and Tower Project?
At 4307 McKinney Ave, about 149 meters from the project at 4333 Cole Ave, permits indicate exterior stucco repairs and equipment work. The records do not identify a new development at 4307.
Also being built nearby
All of 75205- 4301 Mckinney AveNov 6, 2020Install water heater · 11 m away
- 4318 Mckinney AveSep 30, 2025Gas test with permit at the dog park · 26 m away
- 4330 Mckinney AveSep 23, 2026Install exterior piers to stabilize the foundation · 47 m away
- 4333 Mckinney AveNov 19, 20201200 amp service repair transocket and disconnet · 49 m away
- 4343 Mckinney AveMay 12, 2026Replacing the electric water heater in the laundry room · 68 m away
- 4238 Mckinney AveSep 3, 2025Gas repair“ · 134 m away
- 4330 Cole AveOct 28, 2026Replacing 5 ton condenser and coil only · 136 m away
- 4311 Cole AveJul 3, 2025Doing gas test to get gas turned on by atoms emery · 141 m away
- 4315 Cole AveJan 21, 2021Replace or modify existing hvac · 142 m away
- 4342 Cole AveFeb 4, 2026Installation of 6' tall ornamental fence · 145 m away
- 4325 Cole AveOct 7, 2025Replace 1.5 ton w ith 1.5 ton system · 145 m away
- 4333 Cole Ave · The Chapel Of The Cross, Inc.Sep 8, 2026Replace existing unleveled, uneven city sidewalk along oliver st. by parking area and in front of the building approx: 260lnft x 4' wide replace existing city sidewalk and parkway pads along cole ave. 101lnft x 4' wide · 149 m away
More demolitions in 75205.