4516 Mckinney Ave
Dallas, TX 75205
Two rooftop HVAC units to be replaced at 4516 McKinney Ave
A City of Dallas permit filed October 7, 2026, covers like-for-like replacement of two rooftop package units at 4516 McKinney Ave. The units are rated at 10 tons and 7.5 tons.
Summarized from City of Dallas records · updated Oct 7, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 7, 2026
- since Oct 7, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectRemoving and replacing both roof top package units like for like. 10ton package unit & a 7.5ton package unit
Removing and replacing both roof top package units like for like. 10ton package unit & a 7.5ton package unit
City of Dallas permitCommercial Mechanical Permit
Sources: City of Dallas
Questions about 4516 Mckinney Ave
What is being built at 4516 McKinney Ave?
A City of Dallas commercial mechanical permit covers replacing two rooftop package units like for like. It was filed October 7, 2026, under permit COM-MEC-26-002443.
What work is planned at 4516 McKinney Ave?
The permit describes removing and replacing both rooftop package units. It does not describe a new building or a change in use.
What size are the rooftop units at 4516 McKinney Ave?
The permit lists one 10-ton package unit and one 7.5-ton package unit for like-for-like replacement.
When was the permit filed for 4516 McKinney Ave?
The City of Dallas permit was filed October 7, 2026. Its number is COM-MEC-26-002443.
What's happening near Joybird on McKinney Avenue?
At 4516 McKinney Ave, a permit filed October 7, 2026, covers replacing two rooftop package units. Joybird is listed at 4438 McKinney Avenue, about 158 meters away.
Also being built nearby
All of 75205- 4510 Mckinney AveJun 25, 2025Roof over and add 2.5 inches of iso to meet current r30 standard · 11 m away
- 4519 Mckinney Ave · Urban Outfitters, Inc.Oct 29, 2024Anthropologie - mckinney ave — renovation/alteration — retail tenant fit-out. exterior scope by tenant limited to paint of the existing stucco, no site work. interior is limited to some new wall framing, finishes, fixtures, lighting, mechanical etc · 13 m away
- 4528 Mckinney AveFeb 19, 2026Demoliiton of existing structure and foundation · 23 m away
- 4531 Mckinney AveMar 18, 2026Dig up sewer line and make spot repair on 4 foot section of the sewer line. this is for lines 4 ft. deep there is a stoppage and break within 6 feet of near the city cleanouts we will saw cut a 6 x 4 foot section, excavate the line and make repairs on the broken section of pipe · 30 m away
- 4531 Mckinney Avenue · Gilliland Properties, LtdApr 9, 2025Tilebar — renovation/alteration — interior tenant fit out of an existing space with new framing, mechanical, electrical, plumbing, and minor exterior work · 30 m away
- 4544 Mckinney AveNov 17, 2026Over head storm, sanitary, grease waste and domestic cold water · 53 m away
- 4514 Cole Ave · Eos At Highland Park Place LLCAug 28, 2026New interior air devicesnew interior duct runsrelocation of interior duct runsrelocation of exterior duct runsinstallation of exhaust fan for it closetnew supplemental unittest and balance · 142 m away
- 4514 Cole Avenue · Highland Park PlaceApr 8, 2026Abhr- dallas — renovation/alteration — renovation work within the level 14 corridor extending from the elevator lobby to the entrance of the abhr suite · 142 m away
- 4515 Cole Ave · Eos11 At Highland Park Place, LLCJul 6, 2026Massumi + consoli — renovation/alteration — tenant improvement · 154 m away
- 4525 Cole Ave · 4525 Cole Dallas LLC & Et AlDec 3, 2024Ralph lauren temp 2 — renovation/alteration — 4,800 sq ft tenant finish-out. existing restrooms to remain · 156 m away
- 4525 Cole Avenue · Trader Joe's #400Apr 16, 2025Trader joe's #400 — renovation/alteration — interior tenant remodel including but not limited to the below points: -repair/replace finishes/new paint as required throughout -new refrigeration & freezer cases -refrigeration change from gas to co2 -existing restrooms to receive new finishes · 156 m away
- 3101 Knox StAug 2, 2026Existing roof system has one layer of roofing. we are overlaying existing roof system with 60 mil white tpo. installing one layer of insulation mechanically attached with screws and plates for 20year manufacturer's warranty · 157 m away