What's being built in Dallas 75206
1,074 Dallas addresses in 75206 had a building permit or project filing in the past 12 months, out of 1,499 on record. The most active project types are demolitions (115), restaurants (82), pools (70). The latest filing here was November 13, 2026.
- Active in last 12 mo
- 1,074
- Addresses on record
- 1,499
- Latest filing
- Nov 13, 2026
By project type
Recent commercial projects
- 4909 Ross AveNov 13, 2026Interior remodel
- 4500 Greenville AveNov 13, 2026Installing 8' tall precast concrete fence
- 4530 Greenville AveNov 13, 2026Installing an 8' tall precast concrete fence on the north and west sides of the property
- 6688 N Central ExpyNov 13, 2026We are doing to plumbing work for a remodel job at 6688 n. central expy
- 2050 N Henderson Ave · Hendmu - Sam EdelmanNov 12, 2026First time finish out scope of work is an interior tenant fit out to existing landlord shell. scope of work includes but is not limited to, electrical, mechanical and plumbing
- 4800 Northway DrNov 11, 2026Foundation repair installing 22 exterior steel piers to correct the deflection of the slab
- 5309 E Mockingbird LnNov 11, 2026Installation of new conduit for wayfinding kiosk
- 1970 N Henderson AveNov 11, 2026Henderson mixed usebuilding jshell
- 2000 N Henderson AveNov 11, 2026Henderson mixed usebuilding hshell
- 2500 Victory Ave · Dallas Wings Lockers - AacNov 11, 2026Dallas wings lockers - aac — renovation/alteration — 3,225sf renovation incudes a locker room facility and associated program for the dallas wings wnba team
- 5630 Dyer StNov 9, 2026Gas test
- 2508 N Fitzhugh AveNov 9, 2026Install plumbing and water heater
- 8080 N Central Expy · 200 Armstrong BankNov 7, 2026Mcr location address: 8080 north central expressway suite 1275 dallas, tx 75206 scope of work: tenant improvement
- 5399 Twin Sixties DrNov 6, 2026Bu zo pl el class c commercial swimming pool
- 2201 N Henderson AveNov 6, 2026Figs — new construction — tenant fit out
Latest filings
- 5115 Homer StNov 13, 2026Full first floor interior renovation, new 1st flr addition, new rear deck addition, new 2nd flooraddition, and front porch remode, new driveway and fence work
- 5535 Merrimac AveNov 13, 2026Nsfaa-entire home remodel and second story addition with new garage adu build. new driveway, approach, and sidewalk, and new fence
- 6019 Goliad AveNov 13, 20266019 goliad reset reshim 2126sqft to stabilize foundation
- 5815 Vanderbilt AveNov 13, 2026New furnace, evaporator coil, and condenser
- 6011 Mccommas BlvdNov 13, 2026Pouring sidewalk only, existing approach stays
- 4909 Ross AveNov 13, 2026Interior remodel
- 5355 Miller AveNov 13, 2026Installation of jack pads, floor joists and treated beams
- 4500 Greenville AveNov 13, 2026Installing 8' tall precast concrete fence
- 4530 Greenville AveNov 13, 2026Installing an 8' tall precast concrete fence on the north and west sides of the property
- 6688 N Central ExpyNov 13, 2026We are doing to plumbing work for a remodel job at 6688 n. central expy
- 6010 Belmont AveNov 12, 2026Installation of a 26kw generator with 200amp ats, and natural gas connections
- 4203 Concho StNov 12, 2026Install new main gas line from meter to house. run new gas lines under house
- 5541 Richmond AveNov 12, 20265541 richmond - demolish and haul away entire house and haul away. safely transport al of the debris tothe land?ll. shutoff and cap all utilities prior to demolition
- 4311 Concho StNov 12, 2026Nsfaa-rem/add remodel and two-story addition to an existing 1-story single-family home. demolish existing 338 sq ft detached garage. new slab foundation. 777 sq ft 1st-floor a/c addition: bedrooms #3 & #4, baths #3 & #4, utility, mud room, flex room and stair. 582 sq ft 2nd-floor a/c addition: game room, bath #5, closet. 329 sq ft 2nd-floor attic storage/mech. new 575 sq ft attached 2-car garage with alley drive. 114 sq ft covered patio. 78 sq ft front porch extension. new electrical, plumbing and hvac for the addition. roof, siding and trim to match existing. totals: 2,954 sq ft a/c, 4,080 sq ft gross
- 5255 Vanderbilt AveNov 12, 2026Sewer service replacement
- 4217 Delmar AveNov 12, 2026Replacement of the house sewer relay from backyard cleanouts to city tie in
- 2050 N Henderson Ave · Hendmu - Sam EdelmanNov 12, 2026First time finish out scope of work is an interior tenant fit out to existing landlord shell. scope of work includes but is not limited to, electrical, mechanical and plumbing
- 5215 Mercedes AveNov 12, 2026Tunnel job/sewer line repair
- 5709 Kenwood AveNov 11, 2026Sewer yard line replacement & under-foundation connection: replacement of approximately 45 feet of the existingunderground sewer yard line, including excavation, a 6-foot tunnel beneath the pier-and-beam foundation, installation ofdouble cleanouts, and connection to the existing pvc sewer system underneath the home
- 5901 Ross AveNov 11, 2026Unit 4replacing the electric water heater in the garage
- 5731 Llano AveNov 11, 2026Installing 14 total piers
- 4800 Northway DrNov 11, 2026Foundation repair installing 22 exterior steel piers to correct the deflection of the slab
- 5309 E Mockingbird LnNov 11, 2026Installation of new conduit for wayfinding kiosk
- 1970 N Henderson AveNov 11, 2026Henderson mixed usebuilding jshell
- 2000 N Henderson AveNov 11, 2026Henderson mixed usebuilding hshell
- 2500 Victory Ave · Dallas Wings Lockers - AacNov 11, 2026Dallas wings lockers - aac — renovation/alteration — 3,225sf renovation incudes a locker room facility and associated program for the dallas wings wnba team
- 5945 Oram StNov 10, 2026We are going to remove the linear feet of wooden wall and install that linear feet of the allan block wall.we recommend a segmental block wall using allan block ab classic units (6° setback), with a 15inch-wide zone of no-fines concrete (18 inches for option 2) placed behind the units as the wall is built. the no-fines concrete is crushed stone lightly bound with cement; it adds weight to the wall while still allowing water to drain to a 4-inch perforated pipe at the base. the wall is five courses plus a cap at full height, with one course buried, on a 6-inch crushed stone leveling pad. the wall steps down in full courses at the street end to follow the existing grade
- 5448 Anita StNov 10, 2026Install new construction plumbing
- 5810 Goodwin AveNov 10, 2026New water line service from meter to the house
- 5876 Oram StNov 10, 2026Remove and properly dispose of existing roofing materials down to the roof decking. inspect existing roof decking for damaged or deteriorated areas and replace as necessary. install new roofing underlayment, drip edge, flashing, and all required roofing components in accordance with applicable city of dallas building codes and manufacturer specifications. install new roofing shingles and ensure proper ventilation, flashing, and weatherproofing. all work will be performed in a professional manner and in compliance with applicable local building codes and regulations. clean and remove all construction debris from the property upon completion
Questions about 75206
What is being built in 75206?
1,074 Dallas addresses in 75206 had a building permit or project filing in the past 12 months, out of 1,499 on record. The most active project types are demolitions (115), restaurants (82), pools (70). The latest filing here was November 13, 2026.
What new commercial projects are in Dallas 75206?
Recent commercial filings include 4909 Ross Ave, 4500 Greenville Ave, 4530 Greenville Ave.