5945 Oram St
Dallas, TX 75206
Permit covers replacement of wooden wall at 5945 Oram St
A City of Dallas permit filed November 10, 2026, covers replacing a wooden wall at 5945 Oram St with a segmental block wall. The permit description specifies Allan Block units, a crushed-stone leveling pad and drainage behind the wall.
Summarized from City of Dallas records · updated Nov 10, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 10, 2026
- since Nov 10, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectWe are going to remove the linear feet of wooden wall and install that linear feet of the allan block wall.we recommend a segmental block wall using allan block ab classic units (6° setback), with a 15inch-wide zone of no-fines concrete (18 inches for option 2) placed behind the units as the wall is built. the no-fines concrete is crushed stone lightly bound with cement; it adds weight to the wall while still allowing water to drain to a 4-inch perforated pipe at the base. the wall is five courses plus a cap at full height, with one course buried, on a 6-inch crushed stone leveling pad. the wall steps down in full courses at the street end to follow the existing grade
We are going to remove the linear feet of wooden wall and install that linear feet of the allan block wall.we recommend a segmental block wall using allan block ab classic units (6° setback), with a 15inch-wide zone of no-fines concrete (18 inches for option 2) placed behind the units as the wall is built. the no-fines concrete is crushed stone lightly bound with cement; it adds weight to the wall while still allowing water to drain to a 4-inch perforated pipe at the base. the wall is five courses plus a cap at full height, with one course buried, on a 6-inch crushed stone leveling pad. the wall steps down in full courses at the street end to follow the existing grade
City of Dallas permitResidential Accessory Structure Permit
Sources: City of Dallas
Questions about 5945 Oram St
What is being built at 5945 Oram St?
A City of Dallas permit indicates that a wooden wall is being replaced with a segmental block wall.
When was the wall permit filed for 5945 Oram St?
The permit was filed November 10, 2026. Its number is RES-ACC-26-001443.
What kind of block wall is planned at 5945 Oram St?
The permit description specifies Allan Block AB Classic units for a segmental block wall.
How tall is the planned wall at 5945 Oram St?
The permit describes a wall five courses plus a cap at full height, with one course buried. It also says the wall steps down at the street end to follow the existing grade.
Will the wall at 5945 Oram St include drainage?
The permit description calls for a zone of no-fines concrete behind the block units and a perforated pipe at the base to drain water.
Also being built nearby
All of 75206- 5946 Oram StJan 5, 2026Residential gas test · 13 m away
- 5950 Oram StMay 12, 2026Wire new garage · 17 m away
- 5925 Oram StJan 28, 2021Construct new two family dwelling · 21 m away
- 5918 Oram StAug 18, 2026Panel/riser replacement · 50 m away
- 5945 Prospect AveOct 15, 2026Repair to water service at the shutoff · 98 m away
- 5935 Prospect AveMay 26, 20263 ton premium condenser and coil · 100 m away
- 5929 La Vista DrAug 14, 2025Gas test/repair leak · 107 m away
- 5880 Oram StOct 15, 2026Replace existing 4-ton horizontal gas furnace/evaporator coil in attic and outdoor condenser with new 4-ton 16 seer complete hvac system (changeout/alteration); no structural change. transfer existing in-duct uv light to the new system · 113 m away
- 5917 La Vista DrJun 12, 2025Gas test · 115 m away
- 5934 La Vista DrAug 28, 2025Single ac condenser + coil-only change out - no duct work · 116 m away
- 5876 Oram StNov 18, 2026Remove and properly dispose of existing roofing materials down to the roof decking. inspect existing roof decking for damaged or deteriorated areas and replace as necessary. install new roofing underlayment, drip edge, flashing, and all required roofing components in accordance with applicable city of dallas building codes and manufacturer specifications. install new roofing shingles and ensure proper ventilation, flashing, and weatherproofing. all work will be performed in a professional manner and in compliance with applicable local building codes and regulations. clean and remove all construction debris from the property upon completion · 117 m away
- 5924 La Vista DrDec 4, 2025Gas test · 121 m away