5950 Oram St
Dallas, TX 75206
Permits cover a replacement garage and storage space
City of Dallas records indicate a permit was filed March 2, 2026, to demolish an old garage and build a new garage and storage space at 5950 Oram St. A later electrical permit, filed May 12, 2026, covers wiring for the new garage.
Summarized from City of Dallas records · updated May 12, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 12, 2026
- since Mar 2, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 5950 Oram St
What is being built at 5950 Oram St?
A City of Dallas permit describes demolishing an old garage and building a new garage and storage space. The record does not specify the size.
When was the garage project permitted?
The residential alteration and addition permit was filed March 2, 2026. Its number is RES-ALT-ADD-25-001338.
Is there a permit for electrical work at 5950 Oram St?
Yes. A residential electrical permit filed May 12, 2026, describes wiring a new garage. The permit number is RES-ELC-26-002713.
Is the old garage being demolished?
The March 2, 2026, permit description says the project includes demolishing an old garage and building a new one.
Will the project include storage space?
Yes. The City of Dallas permit description says the work includes a new garage and storage space.
Is this a commercial or industrial project?
The records provided list a residential alteration and addition permit and a residential electrical permit. They describe garage and storage work at the address.
Also being built nearby
All of 75206- 5946 Oram StJan 5, 2026Residential gas test · 7 m away
- 5945 Oram StNov 10, 2026We are going to remove the linear feet of wooden wall and install that linear feet of the allan block wall.we recommend a segmental block wall using allan block ab classic units (6° setback), with a 15inch-wide zone of no-fines concrete (18 inches for option 2) placed behind the units as the wall is built. the no-fines concrete is crushed stone lightly bound with cement; it adds weight to the wall while still allowing water to drain to a 4-inch perforated pipe at the base. the wall is five courses plus a cap at full height, with one course buried, on a 6-inch crushed stone leveling pad. the wall steps down in full courses at the street end to follow the existing grade · 17 m away
- 5925 Oram StJan 28, 2021Construct new two family dwelling · 31 m away
- 5918 Oram StAug 18, 2026Panel/riser replacement · 59 m away
- 5929 La Vista DrAug 14, 2025Gas test/repair leak · 100 m away
- 6009 La Vista DrFeb 24, 2026Atmos shut off gas, gas test needed · 105 m away
- 5934 La Vista DrAug 28, 2025Single ac condenser + coil-only change out - no duct work · 108 m away
- 5917 La Vista DrJun 12, 2025Gas test · 110 m away
- 6002 La Vista DrJan 13, 2026Install new complete hvac system · 111 m away
- 5945 Prospect AveOct 15, 2026Repair to water service at the shutoff · 111 m away
- 6004 La Vista DrJan 14, 2026Install new hvac complete system · 113 m away
- 6019 La Vista DrMar 11, 2026Putting 6 plugs and 6 lightsmaybe a sub panel · 113 m away
More demolitions in 75206, warehouses & industrial in 75206.