groundranger
Active · latest filing Nov 2026Commercial

4530 Greenville Ave

Dallas, TX 75206

New 17,260-square-foot office planned at 4530 Greenville Ave

A City of Dallas permit filed April 30, 2026, describes a new single-story office building of about 17,260 square feet at 4530 Greenville Ave. Plans also include covered parking and work areas, an on-site fueling station, and site improvements. A separate permit filed January 12, 2026, covers demolition of an existing office and other site structures.

Summarized from City of Dallas records · updated Nov 13, 2026

Projects
13
13 filings
Latest filing
Nov 13, 2026
since Nov 13, 2026
Largest scope
—
Listed value
—

Permit & project history

13 projects
  1. Installing an 8' tall precast concrete fence on the north and west sides of the property

    Installing an 8' tall precast concrete fence on the north and west sides of the property

    City of Dallas permitCommercial Accessory Structure Permit
    Record
    COM-ACC-26-000289
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Pipe and wire fuel system. main power is brought to us by the site electrician

    Pipe and wire fuel system. main power is brought to us by the site electrician

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-005060
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Electrical contractor

    Electrical contractor

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-003997
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Installing hvac ductwork and equipment for new building - 5 unit ventilators, 1 air curtain, 8 rtus, 16 unit heaters, 4 exhaust fans, 7 hvls fans, 4 ductless splits, 1 mini split, refrigerant piping for split systems, 2 louvers, new ductwork, grilles, adn dampers, tstats mounted, startup of equipment

    Installing hvac ductwork and equipment for new building - 5 unit ventilators, 1 air curtain, 8 rtus, 16 unit heaters, 4 exhaust fans, 7 hvls fans, 4 ductless splits, 1 mini split, refrigerant piping for split systems, 2 louvers, new ductwork, grilles, adn dampers, tstats mounted, startup of equipment

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-001041
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Installing piping and fixtures in new building

    Installing piping and fixtures in new building

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-001666
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Qteam meeting 08.28.25 9amthe project includes the construction of a new single-story office building, approximately 17,260 sq ft in floor area, which will replace an existing office building on the same site which will be demolished under a separate permit. the structure will be a pre-engineered metal building (pemb) on a concrete foundation with drilled piers. additional ancillary structures will include open-air canopies (pemb) which will provide for covered parking of vehicles and protection of materials and equipment. the trailer bay canopy (approximately 4,760 sq ft) will extend to cover an enclosed materials/equipment storage area approximately 560 sq ft in floor area. the kit lanes canopy (approximately 7,200 sq ft) will provide weather protection for staging and pickup of materials. an existing warehouse will continue to function for storage of materials and equipment and will undergo minor modifications and will be permitted separately. an existing communications tower [along with an existing generator and associated propane tank (relocated) and tower support building] will remain in place and will continue to function during and after construction of the new facilities. a new fueling station will be constructed on-site and will utilize an above-ground fuel tank along with two fuel dispensers. sitework will include regrading of the entire site to improve drainage; and, new concrete paving of service drives and truck or trailer parking. new auto parking areas will utilize asphalt paving. the project will include preservation of existing trees, additional landscaping, and new site lighting

    Qteam meeting 08.28.25 9amthe project includes the construction of a new single-story office building, approximately 17,260 sq ft in floor area, which will replace an existing office building on the same site which will be demolished under a separate permit. the structure will be a pre-engineered metal building (pemb) on a concrete foundation with drilled piers. additional ancillary structures will include open-air canopies (pemb) which will provide for covered parking of vehicles and protection of materials and equipment. the trailer bay canopy (approximately 4,760 sq ft) will extend to cover an enclosed materials/equipment storage area approximately 560 sq ft in floor area. the kit lanes canopy (approximately 7,200 sq ft) will provide weather protection for staging and pickup of materials. an existing warehouse will continue to function for storage of materials and equipment and will undergo minor modifications and will be permitted separately. an existing communications tower [along with an existing generator and associated propane tank (relocated) and tower support building] will remain in place and will continue to function during and after construction of the new facilities. a new fueling station will be constructed on-site and will utilize an above-ground fuel tank along with two fuel dispensers. sitework will include regrading of the entire site to improve drainage; and, new concrete paving of service drives and truck or trailer parking. new auto parking areas will utilize asphalt paving. the project will include preservation of existing trees, additional landscaping, and new site lighting

    City of Dallas permitCommercial New Construction Permit
    Record
    COM-NEW-25-000107
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Move meter off the side of a telecom building 1' to tie in the new power. add disconnect between meter and panel

    Move meter off the side of a telecom building 1' to tie in the new power. add disconnect between meter and panel

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-001609
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Demolition and make safe of existing plumbing system, sanitary waste and vent piping install, domestic water piping install, plumbing fixtures install, storm piping install

    Demolition and make safe of existing plumbing system, sanitary waste and vent piping install, domestic water piping install, plumbing fixtures install, storm piping install

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-000882
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. 5 unit ventilators install, 1 air curtain install, 8 rtus install, 16 unit heaters install, 4 exhaust fans install, 7 hvls fans install, 4 ductless splits install, refrigerant piping for split systems install, 2 louvers install, new ductwork install, new grilles and dampers, tstats mounted, startup of equipment

    5 unit ventilators install, 1 air curtain install, 8 rtus install, 16 unit heaters install, 4 exhaust fans install, 7 hvls fans install, 4 ductless splits install, refrigerant piping for split systems install, 2 louvers install, new ductwork install, new grilles and dampers, tstats mounted, startup of equipment

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-000518
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Electrical construction

    Electrical construction

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-000924
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. Temp pole for job trailers

    Temp pole for job trailers

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-000753
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  12. The scope of work includes the demolition of an existing single-story office structure, approximately 20,000 sq ft in floor area, and the total removal of its concrete foundation, as well an attached canopy of 1,250 sq ft the scope will also include the demolition of a single-story storage & vehicle fueling structure of approximately 8,550 sq ft a 9,000 parking canopy will also be demolished along with various site elements (mast-mounted wind generator, guardhouse, portable storage shed, concrete storage bins, etc.) and most of the concrete paving covering the site. an existing tele-communications tower and a small support building, generator and associated propane tank will remain

    The scope of work includes the demolition of an existing single-story office structure, approximately 20,000 sq ft in floor area, and the total removal of its concrete foundation, as well an attached canopy of 1,250 sq ft the scope will also include the demolition of a single-story storage & vehicle fueling structure of approximately 8,550 sq ft a 9,000 parking canopy will also be demolished along with various site elements (mast-mounted wind generator, guardhouse, portable storage shed, concrete storage bins, etc.) and most of the concrete paving covering the site. an existing tele-communications tower and a small support building, generator and associated propane tank will remain

    City of Dallas permitCommercial Demolition Permit
    Record
    COM-DEM-25-000122
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  13. Qteam qr the project includes minor architectural, electrical, and hvac modifications to an existing single-story warehouse structure. the building, with a structural steel frame and exterior walls of brick masonry, is approximately 16,300 sq ft in floor area. the floor slab is elevated above the surrounding grade to accommodate an open loading dock of approximately 4,825 sq ftthis project is located on the same site as a new office building which will be permitted separately. an existing office building, which abuts the warehouse on the north end, will be demolished under a separate demolition permit. minor alterations will be required at the north wall of the warehouse as a result of the adjacent demolition.very limited architectural modifications at the warehouse include the selective demolition of a small existing office area and the construction of a new office area of approximately 750 sq ft of conditioned space and a pair of single-user toilets totaling 230 sq ft, also conditioned.the entire warehouse facility will get a new roofing system including new primary roof drains and related piping routed to discharge rainwater along the west face of the building. new overflow roof drains will replace the original primary drains and will connect to the existing piping which currently discharge thru the face of the dock wall on the east side of the building.in addition to new hvac equipment and ducting at the new office and restroom spaces, the entire building will be outfitted with both exhaust fans and outside air intake hoods along with hvls fans.the entire electrical system will be replaced within the warehouse facility providing new convenience outlets, new lighting (including new egress lighting and lighted exit signs), and power for all new hvac equipment

    Qteam qr the project includes minor architectural, electrical, and hvac modifications to an existing single-story warehouse structure. the building, with a structural steel frame and exterior walls of brick masonry, is approximately 16,300 sq ft in floor area. the floor slab is elevated above the surrounding grade to accommodate an open loading dock of approximately 4,825 sq ftthis project is located on the same site as a new office building which will be permitted separately. an existing office building, which abuts the warehouse on the north end, will be demolished under a separate demolition permit. minor alterations will be required at the north wall of the warehouse as a result of the adjacent demolition.very limited architectural modifications at the warehouse include the selective demolition of a small existing office area and the construction of a new office area of approximately 750 sq ft of conditioned space and a pair of single-user toilets totaling 230 sq ft, also conditioned.the entire warehouse facility will get a new roofing system including new primary roof drains and related piping routed to discharge rainwater along the west face of the building. new overflow roof drains will replace the original primary drains and will connect to the existing piping which currently discharge thru the face of the dock wall on the east side of the building.in addition to new hvac equipment and ducting at the new office and restroom spaces, the entire building will be outfitted with both exhaust fans and outside air intake hoods along with hvls fans.the entire electrical system will be replaced within the warehouse facility providing new convenience outlets, new lighting (including new egress lighting and lighted exit signs), and power for all new hvac equipment

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-000603
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 4530 Greenville Ave

What is being built at 4530 Greenville Ave?

City of Dallas permit COM-NEW-25-000107 describes a new single-story office building of about 17,260 square feet, along with canopies, a storage area, and an on-site fueling station.

When was the new office at 4530 Greenville Ave permitted?

The new construction permit, COM-NEW-25-000107, was filed April 30, 2026.

Will the existing building at 4530 Greenville Ave be demolished?

A demolition permit filed January 12, 2026, covers an existing single-story office building of about 20,000 square feet, along with other structures and site features.

What else is included in the 4530 Greenville Ave project?

The permit describes canopies for covered parking, materials storage, and staging or pickup, plus a new fueling station with an above-ground tank and two dispensers. It also lists paving, drainage, landscaping, and lighting work.

Is there a new gas station planned at 4530 Greenville Ave?

The new construction permit describes an on-site fueling station with an above-ground tank and two fuel dispensers. The records do not describe it as a public gas station.

What permits have been filed for 4530 Greenville Ave?

The records include a new construction permit filed April 30, 2026, and a demolition permit filed January 12, 2026. Later permits cover building systems, electrical work, fuel-system wiring, and an eight-foot precast concrete fence.

Also being built nearby