1108 Quaker St
Dallas, TX 75207
Office remodel with new restrooms and HVAC at 1108 Quaker St
City of Dallas permits indicate an interior office remodel at 1108 Quaker St, including new men's and women's restrooms, breakroom sinks, water coolers, electrical work, and four rooftop units with ductwork. The related permits were filed from September 10 through October 8, 2026.
Summarized from City of Dallas records · updated Oct 8, 2026
- Projects
- 8
- 8 filings
- Latest filing
- Oct 8, 2026
- since Jan 26, 2021
- Largest scope
- —
- Listed value
- $15
- partial · often understated
Permit & project history
8 projectsSources: City of Dallas
Questions about 1108 Quaker St
What is being built at 1108 Quaker St?
City permits indicate an office space remodel, not a new building. The work includes new restrooms, breakroom sinks, water coolers, electrical work, and four rooftop units with ductwork.
When were the office remodel permits filed at 1108 Quaker St?
The latest group of permits was filed from September 10 through October 8, 2026. The records include an interior remodel permit dated September 10 and a mechanical permit dated October 8.
Are new restrooms being added at 1108 Quaker St?
Yes. A City of Dallas plumbing permit filed September 30, 2026, describes adding men's and women's restrooms, four breakroom sinks, and two water coolers.
What HVAC work is planned at 1108 Quaker St?
A City of Dallas mechanical permit filed October 8, 2026, describes installing four rooftop units and ductwork, following plans already submitted.
Is there electrical work at 1108 Quaker St?
Yes. A commercial electrical permit filed September 23, 2026, describes an office space electrical remodel. An earlier permit, filed November 7, 2025, covered replacement of vandalized feeder wires.
What is happening near Socotec on Quaker Street?
At 1108 Quaker St, City permits indicate an office remodel with restroom, plumbing, electrical, and HVAC work. The latest related permit was filed October 8, 2026.
Also being built nearby
All of 75207- 1108 Quaker Street · Sl6 Design District. LPJun 25, 2026Socotec — renovation/alteration — interior renovation
- 1133 Quaker St · 1133 Quaker LLCMay 21, 2024Artistic tile dallas — renovation/alteration — interior finish out · 40 m away
- 1145 Quaker StJul 29, 2026Clean & show permit application to restore electrical service. the building is ready for inspection. confusion between the departing tenant's retail electric provider and the owner's caused the power to go dark · 59 m away
- 1165 Quaker StMar 27, 2026Water line relay · 90 m away
- 1170 Quaker StNov 13, 2025Gas test · 99 m away
- 1174 Quaker StJun 24, 2025Remove existing roof system to deck and replace with new tpo roof system · 105 m away
- 1031 Quaker StAug 11, 2025Electrical no-work: power was shut off due to communication error between reliant and tenant, and oncor needs a permit to re-start power service at the location · 125 m away
- 1188 Quaker StJun 30, 2025Tear off existing roof down to deck and install new tpo roof system · 129 m away
- 2755 Irving BlvdNov 2, 2026Clean and show – temporary power releaserequest for electrical service restoration to an existing vacant commercial building for cleaning, maintenance, and property showing purposes. no electrical installation, alteration, or construction work is proposed. electrical service to be released upon required city inspection · 136 m away
- 2641 Irving Blvd · Buckhead Regency IndustrialJan 10, 2025Richemont suite 600 — renovation/alteration — the scope of this project is an interior finish-out in an existing single floor suite for the above named tenant. scope includes hvac, electrical, and new exterior windows · 207 m away
- 2628 Irving BlvdNov 14, 2025Run gas lines to four rooftop units · 238 m away
- 4718 Iberia AveAug 31, 2026Clean and show · 274 m away
More offices in 75207.