2015 Market Center Blvd
Dallas, TX 75207
Two RPZ replacements permitted at 2015 Market Center Blvd
Two commercial plumbing permits cover RPZ replacements at 2015 Market Center Blvd. The City of Dallas filed permits COM-PLM-26-002649 on July 24, 2026, and COM-PLM-26-002834 on July 29, 2026.
Summarized from City of Dallas records · updated Jul 29, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 29, 2026
- since Jul 24, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2015 Market Center Blvd
What is being built at 2015 Market Center Blvd?
The records describe plumbing work, not a new building: two permits cover replacement of RPZ devices.
What work do the permits at 2015 Market Center Blvd cover?
One permit describes replacing a 1-inch RPZ in a utility room. The other describes replacing a second RPZ.
When were the plumbing permits filed?
The City of Dallas filed permit COM-PLM-26-002649 on July 24, 2026, and permit COM-PLM-26-002834 on July 29, 2026.
What is happening near ME Engineers Expansion on Market Center Boulevard?
At 2015 Market Center Blvd, the City of Dallas issued two commercial plumbing permits for RPZ replacements. The address is about 402 meters from ME Engineers Expansion at 1825 Market Center Boulevard.
What is happening near Equinix Da11 Flex Office?
Two commercial plumbing permits at 2015 Market Center Blvd cover RPZ replacements. The address is about 421 meters from Equinix Da11 Flex Office at 1990 N. Stemmons Freeway.
Also being built nearby
All of 75207- 2010 Market Center BlvdSep 25, 2020Electrical remodel · 36 m away
- 2014 Market Center BlvdOct 1, 2020Electrical repairs · 43 m away
- 1950 Market Center BlvdJun 9, 2026Electrical remodel · 85 m away
- 1926 Market Center BlvdNov 4, 202613 double wall steel pier9 exterior concrete breakout and repatch 2x2 · 131 m away
- 1970 Hi Line Drive · The MeteorAug 16, 2024The meteor at urby dallas — new construction — this is a first-time finish-out for a 1-story restaurant. this will be an interior finish out type 1-b sprinklered · 260 m away
- 1970 Hi Line DrDec 18, 2025Supply labor to accept the walk-in delivery onsite, assemble the new indoor walk-in cooler panels and install the remote refrigeration equipment for the new cooler · 260 m away
- 1930 Hi Line DrDec 24, 2025Direct replacement of 6" wilkins 375ast rpz · 274 m away
- 1330 Turtle Creek BlvdApr 27, 2026Moving a drain for the kitchen · 306 m away
- 2150 Market Center BlvdJul 14, 2026Replace 2" double check with 2" rpz device, wye strainer, isolation valve and hot box · 307 m away
- 2101 N Stemmons FwySep 5, 2025Replace 3/4" rpz in laundry room · 329 m away
- 1445 Turtle Creek BlvdAug 25, 2025Install a 3 phase 208v 100amp circuit for av equipment from 5th floor electrical room to 4th floor. install 100amp fused cam -lock distribution box · 343 m away
- 2265 Market Center BlvdOct 16, 2026Txdot project csj#0196-03-293 (electrical service for roadway illumination) · 347 m away