4722 Gretna St
Dallas, TX 75207
Plumbing and HVAC work at 4722 Gretna St
Commercial permits indicate plumbing work for four showers and related fixtures, along with four new split systems, at 4722 Gretna St. The first listed permit was filed July 14, 2025, and the latest was filed April 10, 2026.
Summarized from City of Dallas records · updated Apr 10, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Apr 10, 2026
- since Jul 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsPlumbing top out and plumbing final for four showers, four water closet , one mop sink, one hand sink and one water fountain and one water heater and four lav
Plumbing top out and plumbing final for four showers, four water closet , one mop sink, one hand sink and one water fountain and one water heater and four lav
City of Dallas permitCommercial Plumbing PermitPlumbing work to subsidize permit number 2410041150_192722284-004. doing both interior and exterior plumbing including up to right-a-way under site permit
Plumbing work to subsidize permit number 2410041150_192722284-004. doing both interior and exterior plumbing including up to right-a-way under site permit
City of Dallas permitCommercial Plumbing Permit
Sources: City of Dallas
Questions about 4722 Gretna St
What is being built at 4722 Gretna St in Dallas?
City of Dallas permits indicate plumbing work, including four showers and related fixtures, as well as four new split systems. The records do not specify a project name or occupant.
What plumbing work is planned at 4722 Gretna St?
Permits describe new plumbing and plumbing work for four showers, four water closets, sinks, a water fountain, a water heater and four lavatories. The plumbing top-out and final permit is dated March 3, 2026 (COM-PLM-26-000863).
Are new HVAC systems being installed at 4722 Gretna St?
A City of Dallas commercial mechanical permit describes four new split systems. It was filed April 10, 2026, under permit COM-MEC-26-000870.
When were permits filed for 4722 Gretna St?
The listed permits span July 14, 2025, through April 10, 2026. They cover plumbing work and four new split systems.
What's happening near Speculative Suites on Vicksburg Street?
Permits at 4722 Gretna St indicate plumbing work and four new split systems. The address is about 137 meters from Speculative Suites at 4745 Vicksburg Street.
What's happening near Blue Fire Catering on Vicksburg Street?
Commercial permits at 4722 Gretna St describe plumbing work, including four showers, and four new split systems. The address is about 175 meters from Blue Fire Catering at 4763 Vicksburg Street.
Also being built nearby
All of 75207- 4724 Gretna St · 1215 Solocum Investments Lp.Oct 23, 2024Gretna street pittet architecturals addition — new construction — new construction of 2-story 9,000 sq ft warehouse. full metal building construction with mep, slab foundation, metal siding. and construction of paved parking lot and driveway entrance · 6 m away
- 4738 Gretna StApr 30, 2026Relocate gas meter · 45 m away
- 4740 Gretna StMar 23, 2026Relocate gas meter · 51 m away
- 4742 Gretna StMay 28, 2026Relocate gas meter · 56 m away
- 4744 Gretna StMay 28, 2026Relocate gas meter · 62 m away
- 4708 Vicksburg StOct 28, 2020Expanding suite 120 by combining existing suites (120,125,130,135) · 90 m away
- 4724 Vicksburg St · 4724 Vicksburg St. LLCJan 22, 20244724 vicksburg — new construction — new construction · 95 m away
- 4748 Algiers St · Blue Fire Catering, LLCMay 28, 2026Co coming up but need service inspection to get power back on · 96 m away
- 4728 Vicksburg St · 4724 Vicksburg St. LLCNov 17, 2025Install hvac for upstairs and downstairs areas. concealed square metal duct under downstairs ceiling. exposed spiral duct upstairs · 100 m away
- 4759 Algiers StAug 27, 2026Moved water heater from roof to 2nd floor closet to prevent. replaced heater with same mode due to freeze breaks · 100 m away
- 4730 Vicksburg St · 4724 Vicksburg St. LLCMar 12, 2026Electrical for new restroom, and 4 new rooms/bays · 103 m away
- 4705 Vicksburg StNov 2, 2020Service release no work · 104 m away