4770 Iberia Ave
Dallas, TX 75207
Gas-meter permits at 4770 Iberia Ave
City of Dallas permits at 4770 Iberia Ave document gas tests and gas-meter relocations, not a new building project. Four permits dated March 17, 2026, describe relocating gas meters; a September 23, 2026, electrical permit says the service release required no work.
Summarized from City of Dallas records · updated Sep 23, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Sep 23, 2026
- since Oct 9, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projectsSources: City of Dallas
Questions about 4770 Iberia Ave
What is being built at 4770 Iberia Ave?
The available City of Dallas permits do not describe a new building. They document gas tests, gas-meter relocations and a service release marked as requiring no work.
What work is happening at 4770 Iberia Ave?
Four commercial plumbing permits dated March 17, 2026, describe relocating gas meters. Earlier permits record gas tests, and a September 23, 2026, electrical permit says no work was being done for the service release.
When were permits filed for 4770 Iberia Ave?
The records span October 9, 2025, through September 23, 2026. The latest is electrical permit COM-ELC-26-004707, dated September 23, 2026.
Are they relocating gas meters at 4770 Iberia Ave?
Yes. Four City of Dallas commercial plumbing permits dated March 17, 2026, describe gas-meter relocations: COM-PLM-26-001041, COM-PLM-26-001042, COM-PLM-26-001043 and COM-PLM-26-001044.
What is happening near Adler Warehouse on Iberia Avenue?
At 4770 Iberia Ave, about 261 meters from Adler Warehouse, city permits document gas tests and gas-meter relocations. The latest permit, dated September 23, 2026, says the service release required no work.
Also being built nearby
All of 75207- 4767 Iberia Ave · Hj3 Ventures LLCJun 25, 2026Bu zo this is a tenant improvement project for an existing two-story commercial building at 4767 iberia avenue, dallas, tx 75207. the new tenants require the addition of a bathroom to comply with the certificate of occupancy for the intended use as warehouse space. scope of work includes new interior partition walls, finishes, electrical, and plumbing necessary to construct the new restroom and complete associated build-out. no changes to the building footprint, structural system, or exterior envelope are proposed · 14 m away
- 4780 Iberia AveJun 22, 2025Install pre-manufactured fiberglass pool · 15 m away
- 4750 Iberia AveAug 11, 2025Gas test with release to atmos · 30 m away
- 4798 Iberia AveOct 5, 2020Install fence · 43 m away
- 4728 Iberia AveMar 18, 2026Relocate gas meter · 64 m away
- 4720 Iberia AveMay 18, 2026No work to be performed. let the co time limit expire · 76 m away
- 4718 Iberia AveAug 31, 2026Clean and show · 79 m away
- 4707 Algiers StNov 17, 2020Interior remodel only · 108 m away
- 4748 Algiers St · Blue Fire Catering, LLCMay 28, 2026Co coming up but need service inspection to get power back on · 117 m away
- 4756 Algiers StJan 12, 2026Electrical remodel · 134 m away
- 4756 Algiers · Beautiful Works INCOct 23, 2025Beautiful works — renovation/alteration — interior remodel with an addition to the second floor · 134 m away
- 4759 Algiers StAug 27, 2026Moved water heater from roof to 2nd floor closet to prevent. replaced heater with same mode due to freeze breaks · 147 m away