1116 Turner Ave
Dallas, TX 75208
1116 Turner Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 1116 Turner Ave, Dallas, TX 75208. The most recent, filed July 14, 2025, covers: “Removing existing shingles down to decking and replacing with new. includes redeck”.
Compiled from City of Dallas records · updated Jul 14, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 14, 2025
- since Jul 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1116 Turner Ave
What is being built at 1116 Turner Ave?
The latest filing (City of Dallas permit RES-ROOF-25-000466, July 14, 2025) covers removing existing shingles down to decking and replacing with new. includes redeck.
How many permits and filings does 1116 Turner Ave have?
1 filing across 1 project, from July 14, 2025 to July 14, 2025.
Is there other construction near 1116 Turner Ave?
Yes. Nearby filings include 1126 Turner Ave (replace water service from the meter to the house, Sep 22, 2026); 1136 Turner Ave (replace (1) hvac system, Apr 16, 2026); 923 Salmon Dr (install a generac generator. utility controlled shutdown needed to install automatic transfer switch, Sep 22, 2026).
How do I get alerts for new permits at 1116 Turner Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 1126 Turner AveSep 22, 2026Replace water service from the meter to the house · 24 m away
- 1136 Turner AveApr 16, 2026Replace (1) hvac system · 49 m away
- 923 Salmon DrSep 22, 2026Install a generac generator. utility controlled shutdown needed to install automatic transfer switch · 112 m away
- 1101 N Winnetka AveSep 25, 2026Electrician will install electrical wring for new addition · 122 m away
- 1119 N Winnetka AveJan 8, 2026Pier and beam- replace horizontal sewer below · 124 m away
- 1106 N Winnetka AveFeb 18, 2026Sewer service · 125 m away
- 1046 N Winnetka AveMar 22, 2026The panel is recessed into siding. going to put plywood behind it to get it flush and the meter base as well. check grounding and clean up panel and replace the neutral wire from meter to panel. right now it’s a bare wire. she had panel replaced and whoever did the work did not get a permit · 127 m away
- 1114 N Winnetka AveJul 24, 20263 ton horizontal gas. lennox el22klv condenser lennox 90%, 2 stage furnace with variable speed blower lennox evaporator coil.hvac replacement · 132 m away
- 902 Salmon DrOct 20, 2020Remove existing roof and install new roof · 143 m away
- 1126 N Winnetka AveDec 15, 2025Gas test · 144 m away
- 1130 N Winnetka AveApr 8, 2026Re-roof of main structure and garage · 148 m away
- 1147 N Winnetka AveJun 17, 2026Re-roof of main structure · 152 m away