1124 Ballard Ave
Dallas, TX 75208
1124 Ballard Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 1124 Ballard Ave, Dallas, TX 75208. The most recent, filed November 12, 2020, covers: “Remove existing roof and install new roof”.
Compiled from City of Dallas records · updated Nov 12, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Nov 12, 2020
- since Nov 12, 2020
- Largest scope
- —
- Listed value
- $7
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 1124 Ballard Ave
What is being built at 1124 Ballard Ave?
The latest filing (City of Dallas permit 2011126020, November 12, 2020) covers remove existing roof and install new roof.
How many permits and filings does 1124 Ballard Ave have?
1 filing across 1 project, from November 12, 2020 to November 12, 2020.
How much is the construction at 1124 Ballard Ave worth?
Permits at this address list about $7 in valuations. Permit valuations are often partial and understate total project cost.
What is being built near Dallas Independence School District in Dallas?
1124 Ballard Ave is about 164 m from Dallas Independence School District (1144 N Madison Ave 1144 N Madison Ave). Its latest filing is for remove existing roof and install new roof.
Is there other construction near 1124 Ballard Ave?
Yes. Nearby filings include 1128 Ballard Ave (gas yard service, Mar 4, 2026); 1112 Ballard Ave (nsfaa replacing drywall, painting walls, replacing part of siding from rot, removing old carpet for flooring, replace light fixtures, replace kitchen cabinets, replace bathroom fixtures, Nov 12, 2026); 1123 Ballard Ave (replacing 40 gallon gas water heater, Sep 23, 2025).
How do I get alerts for new permits at 1124 Ballard Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 1128 Ballard AveMar 4, 2026Gas yard service · 15 m away
- 1112 Ballard AveNov 12, 2026Nsfaa replacing drywall, painting walls, replacing part of siding from rot, removing old carpet for flooring, replace light fixtures, replace kitchen cabinets, replace bathroom fixtures · 48 m away
- 1123 Ballard AveSep 23, 2025Replacing 40 gallon gas water heater · 75 m away
- 1115 N Beckley AveAug 21, 2025Remove and replace grease trap · 95 m away
- 1111 N Beckley AveJul 23, 2026Clean and show permit requested · 98 m away
- 1133 N Zang BlvdOct 15, 2020Erect detached sign · 123 m away
- 1114 Elsbeth AveNov 11, 2026Relocate gas meter · 124 m away
- 1112 N Zang BlvdDec 3, 2020Sewer relay · 139 m away
- 1100 N Zang BlvdDec 23, 2020Tc-2020-23605 11/9/2020 to 5/7/2021 830am to 530pm daily · 142 m away
- 1163 N Madison AveDec 12, 2025Gas tst · 144 m away
- 126 Neches StFeb 18, 2026Water heater replacement (gas) · 144 m away
- 1144 N Madison Ave 1144 N Madison Ave · Dallas Independence School DistrictJan 26, 2024James hogg ntc renovation and addition — additions to existing building — renovation scope includes providing new way-finding site signage, directional signage (entrance & exit), new marquee sign and provide new room graphic and way-finding signage. addition scope of work includes replacing the three rusted and hazardous p · 164 m away