1131 N Clinton Ave
Dallas, TX 75208
1131 N Clinton Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 1131 N Clinton Ave, Dallas, TX 75208. The most recent, filed December 16, 2020, covers: “Replace or modify existing hvac”.
Compiled from City of Dallas records · updated Dec 16, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Dec 16, 2020
- since Dec 16, 2020
- Largest scope
- —
- Listed value
- $8
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 1131 N Clinton Ave
What is being built at 1131 N Clinton Ave?
The latest filing (City of Dallas permit 2012113031, December 16, 2020) covers replace or modify existing hvac.
How many permits and filings does 1131 N Clinton Ave have?
1 filing across 1 project, from December 16, 2020 to December 16, 2020.
How much is the construction at 1131 N Clinton Ave worth?
Permits at this address list about $8 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 1131 N Clinton Ave?
Yes. Nearby filings include 1126 N Clinton Ave (reroof shingles only, Sep 8, 2025); 1142 N Clinton Ave (re-roof of main structure, Jul 30, 2026); 1118 N Clinton Ave (plumbing remodel, Dec 19, 2025).
How do I get alerts for new permits at 1131 N Clinton Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 1126 N Clinton AveSep 8, 2025Reroof shingles only · 16 m away
- 1142 N Clinton AveJul 30, 2026Re-roof of main structure · 31 m away
- 1118 N Clinton AveDec 19, 2025Plumbing remodel · 31 m away
- 1115 N Clinton AveNov 11, 2020Install swimming pool · 37 m away
- 1111 N Clinton AveAug 20, 2026125' of 8' tall cedar fence with 1 pedestrian walk gate · 46 m away
- 1107 N Clinton AveMay 7, 2025Reroof. no redecking needed · 56 m away
- 1130 N Edgefield AveSep 6, 2026Hvac replacement · 104 m away
- 1138 N Edgefield AveAug 10, 2026Replacing 5 ton hvac unit · 106 m away
- 1122 N Edgefield AveMar 2, 2026Scope of work covers, tear off the current roofing system down to clean decking (shingles only). replace it with a new, like roofing system. the contractor shall provide all necessary labor, materials, equipment, and supervision to complete the work in accordance with industry standards, manufacturer specifications, and applicable building codes · 106 m away
- 1106 N Edgefield AveDec 2, 2020Addition to existing detached garage; cd20060904 · 118 m away
- 1123 N Edgefield AveDec 7, 2020Gas test · 119 m away
- 1119 N Winnetka AveJan 8, 2026Pier and beam- replace horizontal sewer below · 120 m away