1531 Cedar Hill Ave
Dallas, TX 75208
Home repairs permitted at 1531 Cedar Hill Ave
City of Dallas permits record a sewer-line replacement at the residence on January 5, 2026, and a firestone unit replacement on November 9, 2026. The records describe repairs, not new construction.
Summarized from City of Dallas records · updated Nov 9, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 9, 2026
- since Jan 5, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 1531 Cedar Hill Ave
What work is permitted at 1531 Cedar Hill Ave?
City of Dallas permits list replacement of the cast iron sewer line under the house and yard to the city sewer, plus replacement of a firestone unit.
When were the permits filed for 1531 Cedar Hill Ave?
The sewer replacement permit was filed January 5, 2026. The firestone unit replacement permit was filed November 9, 2026.
What is permit RES-PLM-26-000067 for?
The City of Dallas permit, filed January 5, 2026, is for replacing the cast iron sewer under the house and yard to the city sewer.
What is permit RES-MEC-26-006089 for?
The City of Dallas permit, filed November 9, 2026, describes replacement of a firestone unit.
Is a new house being built at 1531 Cedar Hill Ave?
The records provided describe sewer-line and firestone unit replacements. They do not list a new-home construction project.
Also being built nearby
All of 75208- 1537 Cedar Hill AveDec 4, 2025Replacement of the furnace, evap coil and condenser. new plenums and changing metal ducts out for flexible ones · 11 m away
- 1541 Cedar Hill AveOct 21, 2026Full gas line replacement · 18 m away
- 1524 Cedar Hill AveMar 11, 2026Re-roof of main structure · 21 m away
- 1522 Cedar Hill AveJan 12, 2021Gas relay or repair with test · 24 m away
- 1532 Oak Knoll StOct 23, 2026Validate on spa/pool permit res-pool-26-ooo-542 install wiring for spa. disconnects and vault installed by others and vault was permitted during house construction · 124 m away
- 1512 Oak Knoll StNov 13, 2025Replace 1- furnace · 128 m away
- 1507 Oak Knoll StSep 24, 2026Mcr with battery installing a 16.315 kw pv system, (1) sol-arklimitless 15k-lv [240v] inverter, and (4) pelio pelio-l-5.12batteries · 145 m away
- 1551 Oak Knoll StOct 30, 2020Remove existing roof and install new roof · 146 m away
- 1555 Oak Knoll StAug 14, 2026Wire lights & equipment on swimming pool · 149 m away
- 1567 Oak Knoll StOct 9, 2026Hvac system replacement/install · 158 m away
- 966 Kessler PkwySep 18, 2026Cedar board fence will be built on the left side, right side, and back sidecedar board fence will be surrounding side yards and backyard. board on board design made with vertical cedar pickets, flat top, 6ft tallalso, neighbor has tree that is right on property line, we are wondering how close can the retaining wall be to said tree. we have the spacing at 5ft, but we want to know if the city will allow for use to get any close to the tree. i have attached the tree drawing on supporting documents as well · 171 m away
- 635 Shady LnApr 22, 2026Two (2) hvac install complete systems · 178 m away