1922 Malone Cliff View
Dallas, TX 75208
1922 Malone Cliff View: 1 project on record
City of Dallas lists 1 filing across 1 project at 1922 Malone Cliff View, Dallas, TX 75208. The most recent, filed October 19, 2020, covers: “Construct new sfd”.
Compiled from City of Dallas records · updated Oct 19, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 19, 2020
- since Oct 19, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1922 Malone Cliff View
What is being built at 1922 Malone Cliff View?
The latest filing (City of Dallas permit 2009181171, October 19, 2020) covers construct new sfd.
How many permits and filings does 1922 Malone Cliff View have?
1 filing across 1 project, from October 19, 2020 to October 19, 2020.
Is there other construction near 1922 Malone Cliff View?
Yes. Nearby filings include 1014 Stafford Ave (demolition sfd, Nov 2, 2020); 1908 Wickmere Mews (install and commission a new backup power system including replacement of the existing main service panel (msp) with a span panel mlo 48. scope of work includes installation of (1) franklin apower2 battery system located inside the garage, associated electrical connections, conduit and wiring, system integration with the existing electrical service, and final commissioning of the battery backup system. installation will also include required smoke and fire alarm detector devices in the garage area in compliance with applicable code requirements for indoor battery installations, Sep 15, 2026); 1902 Wickmere Mews (construct new sfd, Jan 12, 2021).
How do I get alerts for new permits at 1922 Malone Cliff View?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 1014 Stafford AveNov 2, 2020Demolition sfd · 69 m away
- 1908 Wickmere MewsSep 15, 2026Install and commission a new backup power system including replacement of the existing main service panel (msp) with a span panel mlo 48. scope of work includes installation of (1) franklin apower2 battery system located inside the garage, associated electrical connections, conduit and wiring, system integration with the existing electrical service, and final commissioning of the battery backup system. installation will also include required smoke and fire alarm detector devices in the garage area in compliance with applicable code requirements for indoor battery installations · 104 m away
- 1902 Wickmere MewsJan 12, 2021Construct new sfd · 109 m away
- 1010 Mobile StDec 18, 2025Install ev charger · 140 m away
- 1014 Mobile StFeb 27, 2026Demolition house · 141 m away
- 922 Pollard StNov 17, 2025Removal of structure · 142 m away
- 1022 Mobile StNov 13, 2025Demolition sfdblade cleanclear debrisno tree removal · 144 m away
- 1009 Mobile StApr 2, 2026Installing 2 ton hvac equipment · 147 m away
- 1015 Mobile StJan 20, 2026Id like to put a fence in my front yard, along the parameter of the yard. i also want to add a motorized gate across the drive way · 149 m away
- 2109 Sylvan AveOct 21, 2026Commercial alteration addition - roll up door · 152 m away
- 909 Pollard StSep 4, 2026Replumb the drain for two sinks and install one floor sink and drain · 162 m away
- 907 Pollard StDec 11, 2020Remodel existing plumbing · 170 m away