218 N Marlborough Ave
Dallas, TX 75208
EV charger and foundation repair permits at 218 N Marlborough Ave
A City of Dallas permit filed December 10, 2025, describes electrical work for a private residential EV charger connected to an existing main service panel. An earlier permit, filed December 28, 2020, was for foundation repair.
Summarized from City of Dallas records · updated Dec 10, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Dec 10, 2025
- since Dec 28, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsPrivate residential ev charger tied into existing msp #6 cu, #8cu gnd, 3/4" emt or equivalent feeder conductors sized per: nec 625.21, 310.16
Private residential ev charger tied into existing msp #6 cu, #8cu gnd, 3/4" emt or equivalent feeder conductors sized per: nec 625.21, 310.16
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 218 N Marlborough Ave
What is being built at 218 N Marlborough Ave?
City of Dallas records show a permit for electrical work for a private residential EV charger, filed December 10, 2025. A separate permit for foundation repair was filed in 2020.
Is there a permit for an EV charger at 218 N Marlborough Ave?
Yes. Permit RES-ELC-25-005067, filed December 10, 2025, describes a private residential EV charger connected to the existing main service panel.
When was the EV charger permit filed at 218 N Marlborough Ave?
The City of Dallas filed permit RES-ELC-25-005067 on December 10, 2025.
Was foundation work permitted at 218 N Marlborough Ave?
Yes. City of Dallas permit 2012241009, filed December 28, 2020, is described as foundation repair.
Are these permits for a new commercial building at 218 N Marlborough Ave?
The listed records describe a private residential EV charger electrical permit and a single-family renovation permit for foundation repair. They do not describe a new commercial building.
Also being built nearby
All of 75208- 2025 W Jefferson BlvdSep 24, 2020Permanent electrical service · 40 m away
- 1924 W Jefferson BlvdSep 29, 2026Bu zo he me el pl rar we want to add a bar in the space area as per the plans that we attach and any addition work that was done prior to our take over · 61 m away
- 1910 W Jefferson BlvdNov 17, 2026Switching use of space to restaurant without drive through. we notice that in the old floor plans there's no bathrooms that the previous tenant made with out permit prior to us taking over the space we will add it in our floor plans. add a prep station for juice station, acai fruit prep station , coffee station add a grease trap · 84 m away
- 1919 W Jefferson BlvdJun 3, 2025Service repair · 100 m away
- 315 N Marlborough AveAug 11, 2025? company will install 5 new beams? company will install 42 new pad and block piers? company will provide a 3rd party engineer report? company will clean up and haul away the debris · 113 m away
- 224 N Brighton AveMar 3, 2026American standard 3.5 ton deluxe gas completeall new duct work 10 supply’sadd returnsupply plenumnew line set · 118 m away
- 216 N Brighton AveAug 20, 2026We will perform a foundation repairs · 121 m away
- 125 N Marlborough AveDec 3, 2020Gas test · 132 m away
- 305 N Brighton AveSep 11, 2025Remove and replace new 3 ton deluxe 80% gas system · 148 m away
- 305 N Oak Cliff BlvdApr 23, 20262-ton gas full system replacement · 158 m away
- 401 N Marlborough AveSep 18, 2025Replace existing hvac system · 168 m away
- 324 N Brighton AveSep 18, 2026Electrical pool equipment · 170 m away