Permits show a major remodel of a home at 227 S Waverly Dr
Permits indicate an extensive alteration of the existing home at 227 S Waverly Dr, first filed on June 30, 2026. The work includes changes to the interior layout, kitchen and bathrooms, flooring, insulation, and some exterior features. Separate electrical, plumbing, and mechanical permits were filed through October 27, 2026.
Summarized from City of Dallas records · updated Oct 27, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Oct 27, 2026
- since Jun 30, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsRough in and top out bathrooms in house. using existing sewer under house. and existing pex water lines that have been ran previously to us getting involved. we will rough in new bathrooms - same location as current layout. install new water heater and washer box for laundry connections. cap old gas lines and run new gas line to range location. install double cleanout where sewer exits the house
Rough in and top out bathrooms in house. using existing sewer under house. and existing pex water lines that have been ran previously to us getting involved. we will rough in new bathrooms - same location as current layout. install new water heater and washer box for laundry connections. cap old gas lines and run new gas line to range location. install double cleanout where sewer exits the house
City of Dallas permitResidential Plumbing PermitNsfaa- alterationframing, majority of home will not change. per proposed floor plan, remove framed hall closet currently protruded from guest bedroom 1 into the dining room.remove s-facing wall enclosing kitchen from hallway and adjoining pantry. connect walls across from each other down hallway leading to current n-facing exteriordoor [exterior door being relocated] and frame door to enter now enclosed space from kitchen now functioning as the pantry. frame continued hallway wallsstraight to master bedroom door, creating master bath in n-facing enclosure and master closet for the s-facing enclosure. complete plumbing work per proposedplumbing floor plan. complete electrical work per proposed electrical floor plan. install blow-in r38 insulation in attic and r13 insulation in all exterior walls. installnew central thermostat, new air filters, and new ducting, grills, and registers only in areas of home where not currently ran and needed per proposed floor plan.reuse all existing and functioning duct work [most replaced 2022]. no mechanical work to be done on hvac units. install drywall throughout entire home [homecurrently down to frame]. apply tape, bedding, and orange-peel texture on all drywall [walls and ceilings] throughout home. install 16 total doors per proposedfloor plan. current floor plan has 16 doors; reinstall doors in 15 cutouts, close n-facing exterior door, cut out new s-facing exterior across from existing. door countby type; 6-panel interior doors [10], 6-panel interior double dummy or accordion closet doors [3], single entry doors, single exterior doors [2]. all doors will have flat3in casing trim added once installed. all windows in home are currently dated 2022. per proposed plan, no new windows and no windows replaced. fix broken glasspanel on master window and remove and close n-facing window in master. all windows will have flat 3in casing trim added to match home, windows currentlywithout trim. paint approx. 7,700sqft of interior home space including walls, ceilings, doors, baseboards, and all trim in interior. flooring, remove any rotted,warped, and/or damaged subfloor, replace with plywood subflooring throughout home. install approx. 2,120sqft lvp flooring throughout home except in thebathrooms. install new baseboards throughout home, 4in flat to match all other trims. kitchen, install approx. 33lnft of shaker cabinets, paint-grade, 4x8 island with matching shaker paneling on non-functioning sides, integrated trash pull-out, built in vent hood insert or above-range mw, 30in gas range, 24in dishwasher, 30-33inkitchen sink. install approx. 60sqft of lv. 2 white quartz countertop on island and surrounding kitchen cabinetry. install approx. 30 sq ft of kitchen backsplash alongn-facing kitchen wall and small section on w-facing kitchen wall. build-in standard 3-4 shelf wood shelving in pantry. bathrooms, install approx. 165 sq ft of floor tileand approx. 245sqft of wall tile amongst the 3 bathrooms. master bath to have approx. 80 x 30in frameless glass panel designating the shower. install vanities withquartz/marble countertop in each bathroom [singles in guest, double in master], a mirror and vanity light for each sink, alcove tubs in each guest bath, and toilet ineach bathroom. exterior of home, remove 3 rotting posts along entry way and the 3 rotting beams they attach to. replace with 2 new posts and perpendicularcrossbeam attached to each post & smaller 3-4ft post running connecting top of crossbeam to peak of patio. install siding to match existing on walls and soffit only
Nsfaa- alterationframing, majority of home will not change. per proposed floor plan, remove framed hall closet currently protruded from guest bedroom 1 into the dining room.remove s-facing wall enclosing kitchen from hallway and adjoining pantry. connect walls across from each other down hallway leading to current n-facing exteriordoor [exterior door being relocated] and frame door to enter now enclosed space from kitchen now functioning as the pantry. frame continued hallway wallsstraight to master bedroom door, creating master bath in n-facing enclosure and master closet for the s-facing enclosure. complete plumbing work per proposedplumbing floor plan. complete electrical work per proposed electrical floor plan. install blow-in r38 insulation in attic and r13 insulation in all exterior walls. installnew central thermostat, new air filters, and new ducting, grills, and registers only in areas of home where not currently ran and needed per proposed floor plan.reuse all existing and functioning duct work [most replaced 2022]. no mechanical work to be done on hvac units. install drywall throughout entire home [homecurrently down to frame]. apply tape, bedding, and orange-peel texture on all drywall [walls and ceilings] throughout home. install 16 total doors per proposedfloor plan. current floor plan has 16 doors; reinstall doors in 15 cutouts, close n-facing exterior door, cut out new s-facing exterior across from existing. door countby type; 6-panel interior doors [10], 6-panel interior double dummy or accordion closet doors [3], single entry doors, single exterior doors [2]. all doors will have flat3in casing trim added once installed. all windows in home are currently dated 2022. per proposed plan, no new windows and no windows replaced. fix broken glasspanel on master window and remove and close n-facing window in master. all windows will have flat 3in casing trim added to match home, windows currentlywithout trim. paint approx. 7,700sqft of interior home space including walls, ceilings, doors, baseboards, and all trim in interior. flooring, remove any rotted,warped, and/or damaged subfloor, replace with plywood subflooring throughout home. install approx. 2,120sqft lvp flooring throughout home except in thebathrooms. install new baseboards throughout home, 4in flat to match all other trims. kitchen, install approx. 33lnft of shaker cabinets, paint-grade, 4x8 island with matching shaker paneling on non-functioning sides, integrated trash pull-out, built in vent hood insert or above-range mw, 30in gas range, 24in dishwasher, 30-33inkitchen sink. install approx. 60sqft of lv. 2 white quartz countertop on island and surrounding kitchen cabinetry. install approx. 30 sq ft of kitchen backsplash alongn-facing kitchen wall and small section on w-facing kitchen wall. build-in standard 3-4 shelf wood shelving in pantry. bathrooms, install approx. 165 sq ft of floor tileand approx. 245sqft of wall tile amongst the 3 bathrooms. master bath to have approx. 80 x 30in frameless glass panel designating the shower. install vanities withquartz/marble countertop in each bathroom [singles in guest, double in master], a mirror and vanity light for each sink, alcove tubs in each guest bath, and toilet ineach bathroom. exterior of home, remove 3 rotting posts along entry way and the 3 rotting beams they attach to. replace with 2 new posts and perpendicularcrossbeam attached to each post & smaller 3-4ft post running connecting top of crossbeam to peak of patio. install siding to match existing on walls and soffit only
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 227 S Waverly Dr
What is being built at 227 S Waverly Dr in Dallas?
City of Dallas permits indicate a remodel of an existing home, not a new building. The alteration permit, RES-ALT-ADD-26-001095, was filed June 30, 2026.
When was the remodel at 227 S Waverly Dr permitted?
The first listed filing was the residential alteration permit on June 30, 2026. Additional plumbing, electrical, and mechanical permits were filed from July through October 2026.
What work is planned inside the home at 227 S Waverly Dr?
The alteration permit describes changes to the floor plan, kitchen, three bathrooms, flooring, insulation, drywall, and interior finishes. It also calls for relocating an exterior door and changing some exterior entry supports.
Are there plumbing permits for 227 S Waverly Dr?
Yes. Plumbing permit RES-PLM-26-007433 was filed July 17, 2026, for bathroom plumbing work, a water heater, laundry connections, and related gas and sewer work.
What is the latest permit for 227 S Waverly Dr?
The latest listed filing is mechanical permit RES-MEC-26-005874, dated October 27, 2026. Its description says it covers changing out two 2.5-ton systems.
Also being built nearby
All of 75208- 213 S Brighton AveJan 14, 2021Install drive approach only · 114 m away
- 209 S Rosemont AveNov 11, 2025Perform gas test · 118 m away
- 116 S Waverly DrOct 14, 2026Up date electrical service · 119 m away
- 114 S Waverly DrOct 14, 2026Update electrical service · 121 m away
- 111 S Rosemont AveAug 1, 2022Sfd interior/ exterior remodel with addition · 127 m away
- 222 S Rosemont AveMay 14, 2026Replace (1) hvac unit with new · 128 m away
- 210 S Rosemont AveMar 9, 2026Re-establish electrical service to the existing common-area laundry room meter at an existing multifamily fourplex. service was previously disconnected/lapsed under prior ownership. no change to load, no panel or service upgrade proposed. work includes verification of existing service equipment and meter base, inspection/testing for code compliance, and coordination with oncor for reconnection/energization upon city approval/release. no new circuits or fixtures proposed unless required by inspector · 130 m away
- 307 S Rosemont AveJan 27, 2026Interior installmount tankless heater, repipe water lines & discharge, isolating valves, vent piping & removal of old heater · 149 m away
- 311 S Rosemont AveApr 21, 2026Pre approved ca coa-25-000231 the scope includes installing a new 9' high board on board natural cedar fence in the south property line as allowed by the historic winnetka ordinance, on the back alley side (west) with an access gate, and a small fence line on the north side to close the back yard. new fence shown in red in the map · 151 m away
- 315 S Rosemont AveOct 6, 2026Install 2 mini splits · 154 m away
- 319 S Rosemont AveDec 14, 2020Install fence · 157 m away
- 319 S Brighton AveAug 12, 20263.5 ton base horizontal gas system · 158 m away
More restaurants in 75208.