314 S Hampton Rd
Dallas, TX 75208 · South Oak Cliff Dc
36-chair dialysis clinic planned at 314 S Hampton Rd
A 11,629-square-foot interior build-out in an existing one-story building is planned for a 36-chair outpatient dialysis clinic with support spaces. The Texas Department of Licensing and Regulation registration was filed June 18, 2024.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 18, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 18, 2024
- since Jun 18, 2024
- Largest scope
- 11,629 sf
- Estimated cost
- $1.5M
- state registration
Where this project stands
Finishing up · inspection nextSouth Oak Cliff DC
11,629 sq ft · $1.5M est.
- RegisteredJun 18, 2024
- Plan review
- ConstructionAug '24 – Dec '24
- Inspectednow
- Closed
Scheduled to finish Dec 31, 2024; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectThis project consists of interior of a 11,629 s.f. tenant interior build-out of an existing one story single tenant building shell into a new 36 chair outpatient dialysis clinic. the clinic will also include clinic support spaces. — south oak cliff dc
TDLR project registrationRenovation/AlterationReview Complete11,629 sq ft$1.5M est.- Project #
- TABS2024021056
- Tenant / owner
- South Oak Cliff Dc
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 314 S Hampton Rd
What is being built at 314 S Hampton Rd in Dallas?
The project registration describes an interior build-out for a 36-chair outpatient dialysis clinic, including clinic support spaces.
When was the dialysis clinic project filed?
The Texas Department of Licensing and Regulation registration was filed June 18, 2024.
How large is the planned clinic at 314 S Hampton Rd?
The registration describes an 11,629-square-foot interior build-out in an existing one-story building.
What is the project number for the 314 S Hampton Rd clinic?
The TDLR project registration number is TABS2024021056. It was filed June 18, 2024.
What is the estimated cost of the dialysis clinic project?
The applicant's estimated project cost is $1.5 million.
What is being built near Vaquero S Hampton Partners?
A TDLR registration describes a planned 36-chair outpatient dialysis clinic at 314 S Hampton Rd, about 96 meters from Vaquero S Hampton Partners at 412 S Hampton Rd.
Also being built nearby
All of 75208- 338 S Hampton RdApr 20, 2026New electrical outlets,switches and lighting · 23 m away
- 404 S Hampton RdFeb 2, 2026Gas pressure test · 88 m away
- 412 S Hampton Rd · Vaquero S Hampton Partners, LPDec 7, 2025Install new ductwork and diffusers · 96 m away
- 311 Hollywood AveJan 8, 2021Construct new sfd · 115 m away
- 219 S Hampton RdOct 29, 2025Gas test · 138 m away
- 216 S Hampton RdMay 27, 2025Gas meter relocate on behalf of atmos energy · 147 m away
- 406 Hollywood AveDec 31, 2020Permanent electrical service · 155 m away
- 2422 Sunset AveAug 26, 2026Installing a 36k dakin free joint mini split complete system · 168 m away
- 2426 Sunset AveMar 17, 2026Repair fresh water slab leak accessed via 7' tunnel · 171 m away
- 206 S Hampton RdOct 7, 2024Residential plumbing permit · 171 m away
- 2415 Sunset AveNov 9, 2020Gas test · 177 m away
- 500 S Hampton RdNov 3, 2026Zo bc my co application was rejected due to an alteration to the plan. however, i have not made any alterations to the location. this is strictly a change of ownership, with no changes to the premises, operations, structure, or employees.there have been no changes to the existing use or setup of the location. i am not sure whether the previous owner made any changes that were never reported to the city, but i submitted the application based on the location’s current condition, with no alterations made by me · 193 m away