330 N Brighton Ave
Dallas, TX 75208
Sewer line replacement and gas relay permitted at Dallas home
City of Dallas permits indicate residential plumbing work at 330 N Brighton Ave: a gas relay was permitted on January 21, 2026, and 25 feet of sewer line replacement in front of the house was permitted on April 24, 2026. The records describe repairs, not a new building.
Summarized from City of Dallas records · updated Apr 24, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 24, 2026
- since Jan 21, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 330 N Brighton Ave
What work is happening at 330 N Brighton Ave?
City of Dallas permits describe a gas relay and replacement of 25 feet of sewer line in front of the house.
Was a new home permitted at 330 N Brighton Ave?
The records provided do not show a new home permit. They show residential plumbing permits for a gas relay and sewer line replacement.
When was the sewer line work at 330 N Brighton Ave permitted?
The sewer line replacement was permitted on April 24, 2026, under permit RES-PLM-26-004336.
What does the permit say about the sewer work?
Permit RES-PLM-26-004336 describes replacing 25 feet of sewer line in front of the house.
When was the gas relay at 330 N Brighton Ave permitted?
The gas relay was permitted on January 21, 2026, under permit RES-PLM-26-000865.
Also being built nearby
All of 75208- 324 N Brighton AveSep 18, 2026Electrical pool equipment · 5 m away
- 305 N Brighton AveSep 11, 2025Remove and replace new 3 ton deluxe 80% gas system · 26 m away
- 315 N Waverly DrOct 24, 2025Gas test · 90 m away
- 307 N Waverly DrDec 3, 2025Replacing the existing evaporator coil, furnace, and condenser · 92 m away
- 301 N Waverly DrNov 3, 2026Replace meter base and riser · 94 m away
- 314 N Waverly DrAug 28, 2025Gas water heater replacement · 103 m away
- 310 N Waverly DrSep 9, 2026Install new hvac · 104 m away
- 416 N Marlborough AveDec 17, 2024Residential remodel of existing duplex (interior). all new plumbing, electrical, mechanical, insulation, sheetrock, floors, trim, plumbing and lighting fixtures, cabinetry, paint. please see plans for a description. we are not removing any walls. we are only adding a few new closet walls · 124 m away
- 315 N Marlborough AveAug 11, 2025? company will install 5 new beams? company will install 42 new pad and block piers? company will provide a 3rd party engineer report? company will clean up and haul away the debris · 128 m away
- 401 N Marlborough AveSep 18, 2025Replace existing hvac system · 132 m away
- 411 N Marlborough AveJun 3, 2026Garage remodel (electrical)lights 19 and 16 plugs1 fan3 switches 1-220v outlet car charger1 garage door opener · 134 m away
- 427 N Marlborough AveJul 8, 2026Relocate gas meter · 138 m away