419 N Edgefield Ave
Dallas, TX 75208
419 N Edgefield Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 419 N Edgefield Ave, Dallas, TX 75208. The most recent, filed September 29, 2020, covers: “Remove existing roof and install new roof”.
Compiled from City of Dallas records · updated Sep 29, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Sep 29, 2020
- since Sep 29, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 419 N Edgefield Ave
What is being built at 419 N Edgefield Ave?
The latest filing (City of Dallas permit 2009281140, September 29, 2020) covers remove existing roof and install new roof.
How many permits and filings does 419 N Edgefield Ave have?
1 filing across 1 project, from September 29, 2020 to September 29, 2020.
Is there other construction near 419 N Edgefield Ave?
Yes. Nearby filings include 403 N Edgefield Ave (hvac replacement, Sep 5, 2025); 502 N Edgefield Ave (remodel of 2 restrooms: movement of floor drains, installation of 2 sinks and 2 toilets connecting all to existing sanitary sewer line, Sep 2, 2026); 315 N Edgefield Ave (re-roof of main structure, Nov 18, 2026).
How do I get alerts for new permits at 419 N Edgefield Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75208- 403 N Edgefield AveSep 5, 2025Hvac replacement · 13 m away
- 502 N Edgefield AveSep 2, 2026Remodel of 2 restrooms: movement of floor drains, installation of 2 sinks and 2 toilets connecting all to existing sanitary sewer line · 82 m away
- 315 N Edgefield AveNov 18, 2026Re-roof of main structure · 102 m away
- 418 N Windomere AveFeb 18, 2026Replace existing shingles with iko cambridge shingles in “weather wood” and install 7/16" osb sheathing. roof configuration will remain unchanged. work applies to shingles and sheathing only.gutters & downspouts:replace existing gutters around the home to match current color (almond), profile, and location · 103 m away
- 414 N Windomere AveJan 16, 20261 layer composition replace with gaf timberline armorshield ii, ir class 4 · 103 m away
- 406 N Windomere AveNov 12, 2020Gas test · 104 m away
- 405 N Clinton AveJan 12, 20261/2 to 3/4-in gas pipe leak repair (minor) - replacing gas leak to line on fire place · 116 m away
- 311 N Clinton AveMay 12, 2026Install new hvac · 157 m away
- 311 N Windomere AveJul 1, 2026Replace sewer main · 158 m away
- 1314 W Davis StMay 8, 2026Mcr interior partition wall at back of space. interior partition walls (partial height) at open area. re-paint existing walls · 160 m away
- 303 N Clinton AveJan 5, 2026Install customer supplies water heater , does not include code upgrades or any additional parts needed for installationflood stop valve connects to water inlet. wired sensor is set in water heater pan. if water touches sensor it will trip valve to shut off water to heater and sound off alarm to alert homeowner. this device helps eliminate water damage.we will replace all cpvc and pvc in crawl space, walls, and attic. after all lines have been replaced we will check for leaks and insulate water lines. dial one is not responsible for sheetrock damages.job will be permitted and inspected · 161 m away
- 303 N Windomere AveSep 4, 2026New install · 163 m away